      Quantification of Social Impacts of Large Hydropower Dams- a case study of Alborz Dam in Mazandaran Province, Northern Iran

      (ندگان)پدیدآور
      Tajziehchi, S.Monavari, S.M.Karbassi, A.R.Shariat, S.M.Khorasani, N.
      Thumbnail
      دریافت مدرک مشاهده
      FullText
      اندازه فایل: 
      103.7کیلوبایت
      نوع فايل (MIME): 
      PDF
      نوع مدرک
      Text
      Original Research Paper
      زبان مدرک
      English
      نمایش کامل رکورد
      چکیده
      Despite the numerous advantages of large dams, there is still a deep suspicion about the real,long-term benefits and costs of their construction. Land use change on a vast scale, displacement of a largepopulation of indigenous people, loss of biodiversity and production of greenhouse gas emissions, as well as environmental, socioeconomic and cultural consequences resulting therefrom, indicate clearly the need toreconsider the growing trend of dam construction in the world. The present study was conducted to calculatethe real cost of generating electricity imposed on communities and environment in order to clarify the adverse socioeconomic impacts of large dams that are often ignored due to short-term, economic benefits. Accordingly, Alborz Dam, a large dam in northern Iran, was selected as a case study to run cost-benefit analysis by SIMPACTS Software. The obtained results revealed that the total external cost of electricity generation by the hydropower dam is about 0.16 US$/kWh. In other words, the annual cost of the electricity generation by Alborz Hydropower Plant is US$ 4.8 million/year. The highest share (163 US$/MWh) belongs to the loss of agricultural production while the lowest cost (0.10 US$/MWh) is associated with the loss of life. According to the estimated values, a total amount of 1074 tons of greenhouse gas emissions is expected to be released into the air by the hydropower dam operation. It should be stated that SIMPACTS Software only considers the adverse effects of hydropower dams and there is a need to improve the capability of the software by adding the positive impacts in to the overall computations, as well.
      کلید واژگان
      Large dam
      Externalities
      Environmental
      Social
      Resettlement
      Land
      agriculture

      شماره نشریه
      2
      تاریخ نشر
      2013-04-01
      1392-01-12
      ناشر
      University of Tehran/Springer
      سازمان پدید آورنده
      Department of Environment and Energy, Science and Research Branch, Islamic Azad University, Tehran Iran
      Department of Environment and Energy, Science and Research Branch, Islamic Azad University, Tehran Iran
      Graduate Faculty of Environment, University of Tehran, P.O.Box14135-6135,Tehran,Iran
      Graduate Faculty of Environment, University of Tehran, P.O.Box14135-6135,Tehran,Iran
      Graduate Faculty of Environment, University of Tehran, P.O.Box14135-6135,Tehran,Iran

      شاپا
      1735-6865
      2008-2304
      URI
      https://dx.doi.org/10.22059/ijer.2013.615
      https://ijer.ut.ac.ir/article_615.html
      https://iranjournals.nlai.ir/handle/123456789/25282

      مرور

      همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

      حساب من

      ورود به سامانهثبت نام

      تازه ترین ها

      تازه ترین مدارک
      © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
      تماس با ما | ارسال بازخورد
      قدرت یافته توسطسیناوب