• ورود به سامانه
      مشاهده مورد 
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • Journal of Industrial and Systems Engineering
      • Volume 1, Issue 3
      • مشاهده مورد
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • Journal of Industrial and Systems Engineering
      • Volume 1, Issue 3
      • مشاهده مورد
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      A One-Stage Two-Machine Replacement Strategy Based on the Bayesian Inference Method

      (ندگان)پدیدآور
      Fallah Nezhad, Mohammad SaberAkhavan Niaki, Seyed TaghiEshragh- Jahromi, Abdolhamid
      Thumbnail
      دریافت مدرک مشاهده
      FullText
      اندازه فایل: 
      119.1کیلوبایت
      نوع فايل (MIME): 
      PDF
      نوع مدرک
      Text
      Research Paper
      زبان مدرک
      English
      نمایش کامل رکورد
      چکیده
      In this research, we consider an application of the Bayesian Inferences in machine replacement problem. The application is concerned with the time to replace two machines producing a specific product; each machine doing a special operation on the product when there are manufacturing defects because of failures. A common practice for this kind of problem is to fit a single distribution to the combined defect data, usually a distribution with an increasing hazard rate. While this may be convenient, it does not adequately capture the fact that there are two different underlying causes of failures. A better approach is to view the defect as arising from a mixture population: one due to the first machine failures and the other due to the second one. This allows one to estimate the various parameters of interest including the mixture proportion and the distribution of time between productions of defective products for each machine, separately. To do this, first we briefly introduce the data augmentation method for Bayesian inferences in the context of the finite mixture models. Then, we discuss the analysis of time-to-failure data and propose an optimal decision-making procedure for machine replacement strategy. In order to demonstrate the application of the proposed method we provide a numerical example.
      کلید واژگان
      Reliability
      Weibull distribution
      preventive maintenance
      Bayesian inference
      Reliability & Maintenance

      شماره نشریه
      3
      تاریخ نشر
      2007-11-01
      1386-08-10
      ناشر
      Iranian Institute of Industrial Engineering
      سازمان پدید آورنده
      Department of Industrial Engineering, Sharif University of Technology P.O. Box 11365-9414, Azadi Ave., Tehran, Iran
      Department of Industrial Engineering, Sharif University of Technology P.O. Box 11365-9414, Azadi Ave., Tehran, Iran
      Department of Industrial Engineering, Sharif University of Technology P.O. Box 11365-9414, Azadi Ave., Tehran, Iran

      شاپا
      1735-8272
      URI
      http://www.jise.ir/article_3930.html
      https://iranjournals.nlai.ir/handle/123456789/252249

      مرور

      همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

      حساب من

      ورود به سامانهثبت نام

      تازه ترین ها

      تازه ترین مدارک
      © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
      تماس با ما | ارسال بازخورد
      قدرت یافته توسطسیناوب