• ثبت نام
    • ورود به سامانه
    مشاهده مورد 
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Journal of Industrial and Systems Engineering
    • Volume 13, Issue 1
    • مشاهده مورد
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Journal of Industrial and Systems Engineering
    • Volume 13, Issue 1
    • مشاهده مورد
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    A new combination of multi-mode resource-constrained project scheduling and group decision-making process with interval-fuzzy information

    (ندگان)پدیدآور
    Ghasemi, M.Mousavi, S.MeysamAramesh, S.
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    1.024 مگابایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Research Paper
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    Multi-mode resource-constrained project scheduling problem (MRCPSP) is one of the most important extensions of the basic RCPSP. In this paper, a new mathematical model for MRCPSP is presented with a time-quality trade-off approach. The model has two objectives, the first objective minimizes the project completion time, and the second objective maximizes the project quality while the quality of activities can be increased based on the reworking. In addition, in the presented model, total available resources, including renewable and non-renewable, are decision variables. The quality and duration of project activities are interval forms. For this purpose, a new expert weighting method based on interval information is presented to unify the experts' views. The group decision-making method applies a bi-directional projection measure to the positive ideal solution and two negative ideal solutions. Moreover, a new extended interval-fuzzy solution method based on goal programming is proposed to deal with the interval information and mathematical model objectives. The presented mathematical model and group decision-making method are solved with a dataset, and some sensitivity analyses are reported.
    کلید واژگان
    MRCPSP
    group decision-making method
    bi-directional projection measure
    interval information
    reworks
    Decision Analysis
    Project Management

    شماره نشریه
    1
    تاریخ نشر
    2020-01-01
    1398-10-11
    ناشر
    Iranian Institute of Industrial Engineering
    سازمان پدید آورنده
    Department of Industrial Engineering, Faculty of Engineering, Shahed University, Tehran, Iran
    Department of Industrial Engineering, Faculty of Engineering, Shahed University, Tehran, Iran
    Department of Industrial Engineering, Faculty of Engineering, Shahed University, Tehran, Iran

    شاپا
    1735-8272
    URI
    http://www.jise.ir/article_108522.html
    https://iranjournals.nlai.ir/handle/123456789/252185

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب