• ثبت نام
    • ورود به سامانه
    مشاهده مورد 
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Journal of Industrial and Systems Engineering
    • Volume 9, Issue 3
    • مشاهده مورد
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Journal of Industrial and Systems Engineering
    • Volume 9, Issue 3
    • مشاهده مورد
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Improvement of project management office performance: An empirical investigation of effective factors in iranian construction industry

    (ندگان)پدیدآور
    Ershadi, MahmoudAtashfaraz, Reza
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    188.8کیلوبایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Research Paper
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    Project management office (PMO) is a new emerging concept in Iranian construction industry. Executives expect this organizational unit to add value to the business, and meet the demands of stakeholders by performing specialized tasks ranging from providing project management support to portfolio management. In this regard, PMO managers have long faced the question of how to improve the performance of project management office. Regarding the lack of research on this subject, current study focuses on identifying and analyzing the factors positively affecting the project management office performance in Iranian construction industry. The theoretical basis was extracted from the literature, and a field research was conducted for examining factors in Iranian construction industry. The parametric t-test hypothesis testing was used to identify key factors, and the interpretive structural modeling was applied to provide an overview on their interrelationships. The final conceptual model of factors indicates 9 factors in 6 level grouped in 3 category (dependent, linkage and driver variables). Furthermore, the findings provide Iranian construction companies with common understanding, and practical guidelines to steer their project management offices toward creating higher value.
    کلید واژگان
    Project Management Office
    Performance Management
    Interpretive structural modeling
    Iranian Construction Industry
    Project Management

    شماره نشریه
    3
    تاریخ نشر
    2016-07-01
    1395-04-11
    ناشر
    Iranian Institute of Industrial Engineering
    سازمان پدید آورنده
    Industrial Engineering Dept., IHCU University, Tehran, Iran
    Project and Construction Management, Shahid Beheshti University, Tehran, Iran.

    شاپا
    1735-8272
    URI
    http://www.jise.ir/article_16499.html
    https://iranjournals.nlai.ir/handle/123456789/251978

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب