• ثبت نام
    • ورود به سامانه
    مشاهده مورد 
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Journal of Industrial and Systems Engineering
    • Volume 8, Issue 1
    • مشاهده مورد
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Journal of Industrial and Systems Engineering
    • Volume 8, Issue 1
    • مشاهده مورد
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    The construction projects HSE performance evaluation considering the effect of external factors using Choquet integral, case study (an Iranian power plant construction company)

    (ندگان)پدیدآور
    Nahavandi, NasimHemmatjou, RoghayehMoshiri, Behzad
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    511.9کیلوبایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Research Paper
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    Nowadays, industrialization exposes the human and environment resources to serious dangers. The importance of these resources caused the HSE (health, safety and environment) to have a significant contribution in industries' evaluation, especially in construction industry. While evaluating the project's success from an HSE point of view, it is not enough to rely solely on the outputs without considering the impact of external factors affecting them. On the other hand, the variety of factors affecting HSE and their different kinds of interactions, forces us to use another aggregation operators rather than linear ones. Choquet integral (CI) is a well-known powerful aggregation operator to be used in such cases. There are different methods to define the coefficients of CI. One of the most recent and prominent methods is “the most representative capacity definition method". This paper proposes a modification to this method by improving its entropy and consequently the reliability in, as named, non-reference projects evaluation. The modified algorithm is used in evaluating the impact of external factors on HSE performance of power plant construction projects. The results show the prominence of modified algorithm's entropy compared to the original algorithm. Ultimately the external factors integrated score, which resembles the suitability of project's environment, is compared with the score defined considering output results. According to results, in some projects there is a deep gap between score of HSE output result and aggregated score of external factors. The gap of two scores potentially figures the internal organizational factors performance.
    کلید واژگان
    HSE
    External Factors
    Choquet integral
    Entropy
    Variance of capacity

    شماره نشریه
    1
    تاریخ نشر
    2015-02-01
    1393-11-12
    ناشر
    Iranian Institute of Industrial Engineering
    سازمان پدید آورنده
    Department of Industrial engineering, Tarbiat Modares University
    Department of Industrial engineering, Tarbiat Modares University
    CIPCE, School of Electrical & Computer Engineering, Tehran University Tehran, Iran

    شاپا
    1735-8272
    URI
    http://www.jise.ir/article_8729.html
    https://iranjournals.nlai.ir/handle/123456789/251917

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب