• ورود به سامانه
      مشاهده مورد 
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • International Journal of Environmental Research
      • Volume 2, Issue 2
      • مشاهده مورد
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • International Journal of Environmental Research
      • Volume 2, Issue 2
      • مشاهده مورد
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Strategic Management of Municipal Debris aftermath of an earthquake

      (ندگان)پدیدآور
      پدیدآور نامشخص
      Thumbnail
      دریافت مدرک مشاهده
      FullText
      اندازه فایل: 
      148.4کیلوبایت
      نوع فايل (MIME): 
      PDF
      نوع مدرک
      Text
      زبان مدرک
      English
      نمایش کامل رکورد
      چکیده
      Earthquakes in urban areas leave behind a considerable amount of debris, which delays the relief services and the reconstruction activities. The relief work would be impossible without the removal of debris from the main access roads to the devastated areas. The proper implementation of this endeavor requires a long-term management of debris. This article discusses development of strategic management for earthquake debris in the city of Tehran. Thus, the pertinent strengths, weaknesses, opportunities and challenges are identified in order to assess the actual and potential debris management capacity of Tehran. The Personal judgments are used in a Quantitative Strategic Planning Matrix (QSPM) in order to prioritize the strategies. The results of this research show that the sum of attractiveness numbers for the Internal Factors Evaluation (IFE) matrix is 2.3, which is less than 2.5. It indicates that weaknesses are more dominant than the strengths. Moreover, the sum of attractiveness numbers for External Factors Evaluation (EFE) matrix is 3.3, which indicates more potential opportunities than potential challenges. The analysis of results points out that the most important strategies in regard to the development of debris management plan are the accurate estimation of volume, weight and type of earthquake debris; reinforcement of the present structures; proper design of structures under construction; utilization of experiences from other earthquake prone countries; recycling and reuse of debris and construction wastes; and identification of the temporary debris depot sites within Tehran.
      کلید واژگان
      city
      Management
      strategic
      Debris
      Natural disasters
      environment

      شماره نشریه
      2
      تاریخ نشر
      2008-04-01
      1387-01-13
      ناشر
      University of Tehran/Springer

      شاپا
      1735-6865
      2008-2304
      URI
      https://dx.doi.org/10.22059/ijer.2010.195
      https://ijer.ut.ac.ir/article_195.html
      https://iranjournals.nlai.ir/handle/123456789/25129

      مرور

      همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

      حساب من

      ورود به سامانهثبت نام

      تازه ترین ها

      تازه ترین مدارک
      © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
      تماس با ما | ارسال بازخورد
      قدرت یافته توسطسیناوب