    A New Mathematical Model for Production Scheduling in Sub-level Caving Mining Method

    (ندگان)پدیدآور
    Shenavar, M.Ataee-pour, M.Rahmanpour, M.
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    5.572 مگابایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Original Research Paper
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    Production scheduling in underground mines is still a manual process, and achieving a truly optimal result through manual scheduling is impossible due to the complexity of the scheduling problems. Among the underground mining methods, sub-level caving is a common mining method with a high production rate for hard rock mining. There are limited studies about long-term production scheduling in the sub-level caving method. In this work, for sub-level caving production scheduling optimization, a new mathematical model with the objective of net present value (NPV) maximization is developed. The general technical and operational constraints of the sub-level caving method such as opening and developments, production capacity, sub-level mining geometry, and ore access are considered in this model. Prior to the application of the scheduling model, the block model is processed to remove the unnecessary blocks. For this purpose, the floating stope algorithm is applied in order to determine the ultimate mine boundary and reduce the number of blocks that consequently reduces the running time of the model. The model is applied to a bauxite mine block model and the maximum NPV is determined, and then the mine development network is designed based on the optimal schedule.
    کلید واژگان
    Mathematical Modeling
    linear programming
    Underground Mining
    Sub-level Caving
    Production Scheduling
    Optimization
    Net Present Value

    شماره نشریه
    3
    تاریخ نشر
    2020-07-01
    1399-04-11
    ناشر
    Shahrood University of Technology
    سازمان پدید آورنده
    Faculty of Mining and Metallurgy Engineering, Amirkabir University of Technology, Tehran, Iran
    Faculty of Mining and Metallurgy Engineering, Amirkabir University of Technology, Tehran, Iran
    School of mining, college of engineering, University of Tehran, Iran

    شاپا
    2251-8592
    2251-8606
    URI
    https://dx.doi.org/10.22044/jme.2020.9139.1804
    http://jme.shahroodut.ac.ir/article_1773.html
    https://iranjournals.nlai.ir/handle/123456789/242964

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب