    Application of stochastic programming for iron ore quality control

    (ندگان)پدیدآور
    Gholamnejad, J.Azimi, A.Teymouri, M.R.
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    996.8کیلوبایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Case Study
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    Stockpiling and blending play a major role in maintaining the quantity and quality of the raw materials fed into processing plants, especially the cement, iron ore and steel making, and coal-fired power generation industries that usually require a much uniformed feed. Due to the variable nature of such materials, they even come from the same source and the produced ores or concentrates are seldom homogeneous enough to be directly fed to the processing plant ore furnaces. Processing plants in iron ore mines need uniform feed properties in terms of each variable (in this work, iron phosphorous ratio and Fe content in magnetite phase) grade of ore, and therefore, homogenization of iron ore from different benches of an open pit or ore dumps has become an essential part of modern mine scheduling. When ore dumps are considered as an ore source, the final grade of the material leaving the dump to the blending bed cannot be easily determined. This difficulty contributes to mixing the materials of different grades in a dump. In this work, the ore dump elements were treated as normally distributed random variables. Then a stochastic programming model was formulated in an iron ore mine in order to determine the optimum amount of ore dispatched from different bench levels in open pit and also four ore dumps to a windrow-type blending bed in order to provide a mixed material of homogenous composition. The chance-constrained programming technique was used to obtain the equivalent deterministic non-linear programming problem of the primary model. The resulting non-linear model was then solved using LINGO. The results obtained showed a better feed grade for the processing plant with a higher probability of grade blending constraint satisfaction.
    کلید واژگان
    Stochastic Programming
    Iron Ore Mine
    Homogenization
    Processing Plant
    Ventilation & HSE

    شماره نشریه
    2
    تاریخ نشر
    2018-04-01
    1397-01-12
    ناشر
    Shahrood University of Technology
    سازمان پدید آورنده
    Department of Mining and Metallurgical Engineering, Yazd University, Yazd, Iran
    Department of Mining and Metallurgical Engineering, Yazd University, Yazd, Iran
    Ore Processing Supervisory and Management, Asfalt-Tous Company, Yazd, Iran

    شاپا
    2251-8592
    2251-8606
    URI
    https://dx.doi.org/10.22044/jme.2018.5952.1409
    http://jme.shahroodut.ac.ir/article_1148.html
    https://iranjournals.nlai.ir/handle/123456789/242829

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب