Identifying Early Warnings in Drilling Projects and Finding their Relationships to the Outcomes and Problems of these Projects in Some Real Cases in Iran
(ندگان)پدیدآور
Shokouhi, Mohammad RezaBeheshti, MohsenFatahi, KamranRahmati, Abdolsamadنوع مدرک
TextOriginal Article
زبان مدرک
Englishچکیده
As projects increase in size and complexity, they become more difficult to handle. One of these large and complex projects is oil and gas projects. The current controlling processes of projects are not able to detect the problems in early phases of the project and are rather late leading to extra time and cost. One solution is to find symptoms of problems in the early phases. Due to the importance of drilling projects in upstream sector, the main objective of this research is to identify the early warning symptoms of problems in drilling projects and to find the relationships between selected early warnings with project outcomes and problems of these projects. To reach that aim, the early warnings have been recognized through literature review and interviews with experts. Then, case study analysis is performed to find the relationships between early warnings and project outcomes. All cases have been selected from previous completed drilling projects in one of the oil fields of Iran. Findings show that there is a relationship between early warnings, project outcomes and projects problems.
کلید واژگان
Early WarningDrilling Projects
Project Outcomes
Project Problems
case study
شماره نشریه
2تاریخ نشر
2018-05-011397-02-11
ناشر
Petroleum University of Technologyسازمان پدید آورنده
Assistant Professor, Energy Economics & Management Department, Petroleum Faculty of Tehran, Petroleum University of Technology, Tehran, IranEnergy Economics & Management Department, Petroleum Faculty of Tehran, Petroleum University of Technology, Tehran, Iran
Tehran Energy Consultant, Tehran, Iran
NIOC, Tehran, Iran
شاپا
2645-47262645-4734
Related items
Showing items related by title, author, creator and subject.
-
A Mathematical Model for Project Portfolio Selection with Project Interdependency, Project Divisibility, Reinvestment and Resourcing in Different Ways
Bouyari, Farshad؛ Moussavi, Seyed Meysam؛ Vahdani, Behnam (University of Tehran, 2018-07-01)Project portfolio management consists of repetitive cycles of project assess, selection, and execution. Project portfolio selection is the main part of project portfolio management, where the organization identifies and ...
-
On two generalizations of semi-projective modules: SGQ-projective and $pi$-semi-projective
Amouzegar, Tayyebeh (University of Guilan, 2016-12-01)Let $R$ be a ring and $M$ a right $R$-module with $S=End_R(M)$. A module $M$ is called semi-projective if for any epimorphism $f:Mrightarrow N$, where $N$ is a submodule of $M$, and for any homomorphism $g: Mrightarrow N$, ...
-
Assessment and management of occupational risks in industrial projects using the HAZID technique: a case study of chain dry boom crane in Yazd alloy steel oxygen plant project
Fallah, Rohollah؛ Zendehdel, Navid؛ Torkian, Hamidreza؛ Akhavan, Afarin؛ Khajehaminian, Mohammad Reza (دانشگاه علوم پزشکی شهید صدوقی یزد, 2024-12-01)Introduction: Attention must be paid to the key role of chain dry boom cranes in heavy industrial projects such as the steel industry to identify and manage related occupational risks. This study aimed to identify, evaluate, ...




