    Potential Risks Occurring in Fidic Contract Construction Projects: A Literature Review

    (ندگان)پدیدآور
    purba, humorasYuri Prastowo, Toni
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    523.3کیلوبایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Original Article
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    Most major construction projects in the world are based on standard contract conditions for international projects issued by the Fédération Internationale des Ingénieurs-Conseils (FIDIC, or International Federation of Consulting Engineers), which are based on concept law rooted in the common law system. Thus, the stakeholders involved in construction projects in the World need to understand the interpretation of FIDIC provisions against a background of civil law. This literature study will explore the identification of risks that occur in international projects using FIDIC contracts. A systematic review and detailed content analysis of 30 articles selected from respected academics and relevant journals published over the past three decades was carried out. The findings of risk identification are divided into 5 namely (1) Planning and Design, (2) Construction, (3) Operations & Maintenance, (4) Political Environment and (5) Social Economic. This study trying to identify, investigate, and classify the strongest factors that are considered to influence delays in construction projects. From the results of grouping identification, it is found that the greatest risk in FIDIC construction contracts is when the construction work is caused due to the complexity of the problems at the time of the construction, whether the dispute, payment or claims of work results. Recommendations from the authors would be good for the relevant stakeholders the project uses the FIDIC contract to further study the contents of the contract to help reduce or at least minimize the risk of project delays, especially during construction.
    کلید واژگان
    Risk Identification
    Fidic contract

    شماره نشریه
    1
    تاریخ نشر
    2020-03-01
    1398-12-11
    ناشر
    Papyrus Press
    سازمان پدید آورنده
    Industrial Engineering Department, Mercu Buana University, Jakarta, Indonesia
    Research Assistant, Civil Engineering Department, Mercu Buana University, Jakarta, Indonesia

    شاپا
    2645-7229
    URI
    https://dx.doi.org/10.30469/arce.2020.106040
    http://www.arce.ir/article_106040.html
    https://iranjournals.nlai.ir/handle/123456789/20577

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب