• ورود به سامانه
      مشاهده مورد 
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • International Journal of Research in Industrial Engineering
      • Volume 8, Issue 2
      • مشاهده مورد
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • International Journal of Research in Industrial Engineering
      • Volume 8, Issue 2
      • مشاهده مورد
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Development of a maintenance schedule plan to improve the equipment efficiency of an industry: a case study

      (ندگان)پدیدآور
      Shams, A.Rabby, Md. F.Istiak, Md. N.
      Thumbnail
      دریافت مدرک مشاهده
      FullText
      اندازه فایل: 
      637.0کیلوبایت
      نوع فايل (MIME): 
      PDF
      نوع مدرک
      Text
      Research Paper
      زبان مدرک
      English
      نمایش کامل رکورد
      چکیده
      The aim of this study is to implement Total Productive Maintenance (TPM) in a continuous injection molding industry. By implementing TPM, the industry can increase their Overall Equipment Effectiveness (OEE) and productivity. Before implementing TPM, overall equipment efficiency, availability rate, performance rate, and quality rate of the injection molding machine were 74.9%, 88.54%, 88.5%, and 95.6%, respectively. It needs to be improved for good operating condition of machines. In this paper, some tools are suggested to improve their productivity and maintenance procedure. These tools are cause and effect diagram, Pareto chart, WWBLA, and preventive maintenance schedule. TPM program is to change the culture of the company maintenance policy with involvement of all employees toward the maintenance system of the company. Through the proper planning of maintenance schedule, productivity can be improved. This schedule helps to maintain machines in good operating conditions as well as a good OEE value, and a world class standard OEE is achieved.
      کلید واژگان
      Keywords: TPM
      Cause and effect diagram
      Pareto Chart
      Total quality management and quality engineering

      شماره نشریه
      2
      تاریخ نشر
      2019-06-01
      1398-03-11
      ناشر
      Ayandegan Institute of Higher Education, Iran
      سازمان پدید آورنده
      19 Azimpur, New Market, Lal Bag Dhaka-1205.
      19 Azimpur, New Market, Lal Bag Dhaka-1205.
      19 Azimpur, New Market, Lal Bag Dhaka-1205.

      شاپا
      1925-7805
      1925-7813
      URI
      https://dx.doi.org/10.22105/riej.2019.174907.1082
      http://www.riejournal.com/article_90977.html
      https://iranjournals.nlai.ir/handle/123456789/16892

      مرور

      همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

      حساب من

      ورود به سامانهثبت نام

      تازه ترین ها

      تازه ترین مدارک
      © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
      تماس با ما | ارسال بازخورد
      قدرت یافته توسطسیناوب