نمایش مختصر رکورد

dc.contributor.authorBehmanesh, Rezaen_US
dc.contributor.authorZandieh, Mostafaen_US
dc.contributor.authorHadji Molana, Seyyed Mohammaden_US
dc.date.accessioned1399-07-08T21:50:44Zfa_IR
dc.date.accessioned2020-09-29T21:50:44Z
dc.date.available1399-07-08T21:50:44Zfa_IR
dc.date.available2020-09-29T21:50:44Z
dc.date.issued2019-06-01en_US
dc.date.issued1398-03-11fa_IR
dc.date.submitted2017-03-31en_US
dc.date.submitted1396-01-11fa_IR
dc.identifier.citationBehmanesh, Reza, Zandieh, Mostafa, Hadji Molana, Seyyed Mohammad. (2019). The surgical case scheduling problem with fuzzy duration time: An ant system algorithm. Scientia Iranica, 26(3), 1824-1841. doi: 10.24200/sci.2018.20602en_US
dc.identifier.issn1026-3098
dc.identifier.issn2345-3605
dc.identifier.urihttps://dx.doi.org/10.24200/sci.2018.20602
dc.identifier.urihttp://scientiairanica.sharif.edu/article_20602.html
dc.identifier.urihttps://iranjournals.nlai.ir/handle/123456789/119303
dc.description.abstractIn this paper, we address the surgical case scheduling problem in multi operating theater environment with uncertain service times in order to minimize makespan. In surgical case scheduling, not only the hospital resources are allocated to surgical cases but also the start time of performing surgeries is determined based on sequence of cases in a short-term time horizon. We consider fuzzy numbers for duration times of all stages and hereafter the problem called fuzzy surgical case scheduling. Since the operational environment in the problem is similar to no-wait multi-resource fuzzy flexible job shop problem, we consider constraints of that for formulating and solving problem. This problem is strongly an NP-hard optimization problem, hence we employ ant system algorithm to tackle problem. The proposed approach is illustrated by detailed examples of three test cases, and numerical computational experiments. Therefore, the performance of proposed algorithm is compared with a schedule constructed by first-come-first-service rule on all test instances. Also, a real case is provided from Isfahan's hospital to evaluate proposed algorithm.  Consequently, computational experiments state that algorithm outperforms results obtained by hospital planning as well as fuzzy rule, and these indicate efficiency and capability of our algorithm for optimizing the makespan.en_US
dc.languageEnglish
dc.language.isoen_US
dc.publisherSharif University of Technologyen_US
dc.relation.ispartofScientia Iranicaen_US
dc.relation.isversionofhttps://dx.doi.org/10.24200/sci.2018.20602
dc.subjectSurgical case schedulingen_US
dc.subjectAnt Systemen_US
dc.subjectOperating theateren_US
dc.subjectFuzzy duration timeen_US
dc.subjectMakespanen_US
dc.subjectMixed integer programmingen_US
dc.subjectIndustrial Engineeringen_US
dc.titleThe surgical case scheduling problem with fuzzy duration time: An ant system algorithmen_US
dc.typeTexten_US
dc.typeArticleen_US
dc.contributor.departmentIndustrial Engineering Department, Science and Research Branch, Islamic Azad University, Tehran, Iranen_US
dc.contributor.departmentIndustrial Management Department, Management and Accounting Faculty, Shahid Beheshti University,G.C., Tehran, Iranen_US
dc.contributor.departmentIndustrial Engineering Department, Science and Research Branch, Islamic Azad University, Tehran, Iranen_US
dc.citation.volume26
dc.citation.issue3
dc.citation.spage1824
dc.citation.epage1841
nlai.contributor.orcid0000-0002-0990-1994
nlai.contributor.orcid0000-0003-1209-9514


فایل‌های این مورد

فایل‌هااندازهقالبمشاهده

فایلی با این مورد مرتبط نشده است.

این مورد در مجموعه‌های زیر وجود دارد:

نمایش مختصر رکورد