• ثبت نام
    • ورود به سامانه
    مشاهده مورد 
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Scientia Iranica
    • Volume 26, Issue 3
    • مشاهده مورد
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Scientia Iranica
    • Volume 26, Issue 3
    • مشاهده مورد
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    The surgical case scheduling problem with fuzzy duration time: An ant system algorithm

    (ندگان)پدیدآور
    Behmanesh, RezaZandieh, MostafaHadji Molana, Seyyed Mohammad
    Thumbnail
    نوع مدرک
    Text
    Article
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    In this paper, we address the surgical case scheduling problem in multi operating theater environment with uncertain service times in order to minimize makespan. In surgical case scheduling, not only the hospital resources are allocated to surgical cases but also the start time of performing surgeries is determined based on sequence of cases in a short-term time horizon. We consider fuzzy numbers for duration times of all stages and hereafter the problem called fuzzy surgical case scheduling. Since the operational environment in the problem is similar to no-wait multi-resource fuzzy flexible job shop problem, we consider constraints of that for formulating and solving problem. This problem is strongly an NP-hard optimization problem, hence we employ ant system algorithm to tackle problem. The proposed approach is illustrated by detailed examples of three test cases, and numerical computational experiments. Therefore, the performance of proposed algorithm is compared with a schedule constructed by first-come-first-service rule on all test instances. Also, a real case is provided from Isfahan's hospital to evaluate proposed algorithm.  Consequently, computational experiments state that algorithm outperforms results obtained by hospital planning as well as fuzzy rule, and these indicate efficiency and capability of our algorithm for optimizing the makespan.
    کلید واژگان
    Surgical case scheduling
    Ant System
    Operating theater
    Fuzzy duration time
    Makespan
    Mixed integer programming
    Industrial Engineering

    شماره نشریه
    3
    تاریخ نشر
    2019-06-01
    1398-03-11
    ناشر
    Sharif University of Technology
    سازمان پدید آورنده
    Industrial Engineering Department, Science and Research Branch, Islamic Azad University, Tehran, Iran
    Industrial Management Department, Management and Accounting Faculty, Shahid Beheshti University,G.C., Tehran, Iran
    Industrial Engineering Department, Science and Research Branch, Islamic Azad University, Tehran, Iran

    شاپا
    1026-3098
    2345-3605
    URI
    https://dx.doi.org/10.24200/sci.2018.20602
    http://scientiairanica.sharif.edu/article_20602.html
    https://iranjournals.nlai.ir/handle/123456789/119303

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب