    Choice of Optimum Combination of Construction Machinery Using Modified Advanced Programmatic Risk Analysis and Management Model

    (ندگان)پدیدآور
    Zeynalian, MehranKalantari Dehaghi, Iman
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    1.989 مگابایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Article
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    Since the proper use of construction machinery in infrastructure projects is important, it is essential to employ an optimum selection of machinery in these projects. Advanced programmatic risk analysis and management model (APRAM) is one of recently developed methods that can be used for risk analysis and management purposes considering schedule, cost and quality, simultaneously. In this paper, first the APRAM method is introduced and then modified in order to consider environmental risks. This method can consider potential risks that might occur over the entire life cycle of the project, and can be employed as an efficient decision-support tool for construction managers selecting machinery for an infrastructure project where various alternatives might be technically feasible. A case study of three possible combinations of excavation machines is then discussed. All project risks related to cost, time, quality and environment are identified, considering the capital costs which should be spent on each combination. Finally, some graphs which are derived from the method are taken into account in order to decrease each combination's risks and to optimize the selection of excavating machinery. The outcomes highlight the efficiency of the APRAM model for the optimal selection of machinery in construction projects.
    کلید واژگان
    Risk Management
    Construction Management
    Machinery Combination
    Subway Project
    Environmental impacts
    Civil Engineering

    شماره نشریه
    3
    تاریخ نشر
    2018-06-01
    1397-03-11
    ناشر
    Sharif University of Technology
    سازمان پدید آورنده
    Department of Civil E ngineering, University of Isfahan , Iran. 81746 - 73441
    Department of Civil E ngineering, University of Isfahan Iran. 81746 - 73441

    شاپا
    1026-3098
    2345-3605
    URI
    https://dx.doi.org/10.24200/sci.2017.4197
    http://scientiairanica.sharif.edu/article_4197.html
    https://iranjournals.nlai.ir/handle/123456789/118755

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب