| dc.contributor.author | Molaei, Somayeh | en_US |
| dc.contributor.author | Seyed Esfahani, Mir Mahdi | en_US |
| dc.contributor.author | Esfahanipour, Akbar | en_US |
| dc.date.accessioned | 1399-07-08T21:40:43Z | fa_IR |
| dc.date.accessioned | 2020-09-29T21:40:43Z | |
| dc.date.available | 1399-07-08T21:40:43Z | fa_IR |
| dc.date.available | 2020-09-29T21:40:43Z | |
| dc.date.issued | 2016-01-01 | en_US |
| dc.date.issued | 1394-10-11 | fa_IR |
| dc.date.submitted | 2015-01-31 | en_US |
| dc.date.submitted | 1393-11-11 | fa_IR |
| dc.identifier.citation | Molaei, Somayeh, Seyed Esfahani, Mir Mahdi, Esfahanipour, Akbar. (2016). Using Genetic Algorithm to Robust Multi Objective Optimization of Maintenance Scheduling Considering Engineering Insurance. Journal of System Management, 2(1), 1-19. | en_US |
| dc.identifier.issn | 2322-2301 | |
| dc.identifier.issn | 2538-1571 | |
| dc.identifier.uri | http://sjsm.iaushiraz.ac.ir/article_519601.html | |
| dc.identifier.uri | https://iranjournals.nlai.ir/handle/123456789/115723 | |
| dc.description.abstract | Efficient and on-time maintenance plays a crucial role in<br />reducing cost and increasing the market share of an industrial unit. Preventive<br />maintenance is a broad term that encompasses a set of activities<br />aimed at improving the overall reliability and availability of a system<br />before machinery breakdown. The previous studies have addressed the<br />scheduling of preventive maintenance. These studies have computed the<br />time and the type of preventive maintenance by modeling the total cost<br />related to it. Todays the engineering insurance is an appropriate and<br />durable protection for reducing the risks related to the industrial machinery.<br />This kind of insurance covers a part of maintenance costs. Previous<br />researches did not consider the effect of engineering insurance<br />on maintenance scheduling while it affects the total cost function of maintenance scheduling seriously. Given the above-mentioned remarks,<br />this paper introduces for the first time a new scheduling of preventive<br />maintenance with considering total cost and total reliability of the system<br />in which the effect of engineering insurance has been taken into<br />account. Due to the uncertainty in the input parameters, which are<br />very common in application, the paper proposed the application of robust<br />design approaches. To solve this multi objective model, first it has<br />been transformed into a single objective model by using global criterion<br />and the resultant model is solved through genetic algorithm. The<br />results show the magnitude effect of engineering insurance on maintenance<br />scheduling. Therefore, neglecting the importance of engineering<br />insurance leads to an inefficient scheduling maintenance. | en_US |
| dc.language | English | |
| dc.language.iso | en_US | |
| dc.publisher | Islamic Azad University Shiraz Branch | en_US |
| dc.relation.ispartof | Journal of System Management | en_US |
| dc.subject | Preventive maintenance | en_US |
| dc.subject | engineering insurance | en_US |
| dc.subject | Robust Optimization | en_US |
| dc.subject | global criterion method | en_US |
| dc.subject | Genetic Algorithm | en_US |
| dc.subject | Pareto set solutions | en_US |
| dc.title | Using Genetic Algorithm to Robust Multi Objective Optimization of Maintenance Scheduling Considering Engineering Insurance | en_US |
| dc.type | Text | en_US |
| dc.type | Research Paper | en_US |
| dc.contributor.department | Department of Industrial Engineering,
Amirkabir University of Technology,
Iran, Tehran | en_US |
| dc.contributor.department | Department of Industrial Engineering,
Amirkabir University of Technology,
Iran, Tehran | en_US |
| dc.contributor.department | Department of Industrial Engineering,
Amirkabir University of Technology,
Iran, Tehran | en_US |
| dc.citation.volume | 2 | |
| dc.citation.issue | 1 | |
| dc.citation.spage | 1 | |
| dc.citation.epage | 19 | |