نمایش مختصر رکورد

dc.contributor.authorMolaei, Somayehen_US
dc.contributor.authorSeyed Esfahani, Mir Mahdien_US
dc.contributor.authorEsfahanipour, Akbaren_US
dc.date.accessioned1399-07-08T21:40:43Zfa_IR
dc.date.accessioned2020-09-29T21:40:43Z
dc.date.available1399-07-08T21:40:43Zfa_IR
dc.date.available2020-09-29T21:40:43Z
dc.date.issued2016-01-01en_US
dc.date.issued1394-10-11fa_IR
dc.date.submitted2015-01-31en_US
dc.date.submitted1393-11-11fa_IR
dc.identifier.citationMolaei, Somayeh, Seyed Esfahani, Mir Mahdi, Esfahanipour, Akbar. (2016). Using Genetic Algorithm to Robust Multi Objective Optimization of Maintenance Scheduling Considering Engineering Insurance. Journal of System Management, 2(1), 1-19.en_US
dc.identifier.issn2322-2301
dc.identifier.issn2538-1571
dc.identifier.urihttp://sjsm.iaushiraz.ac.ir/article_519601.html
dc.identifier.urihttps://iranjournals.nlai.ir/handle/123456789/115723
dc.description.abstractEfficient and on-time maintenance plays a crucial role in<br />reducing cost and increasing the market share of an industrial unit. Preventive<br />maintenance is a broad term that encompasses a set of activities<br />aimed at improving the overall reliability and availability of a system<br />before machinery breakdown. The previous studies have addressed the<br />scheduling of preventive maintenance. These studies have computed the<br />time and the type of preventive maintenance by modeling the total cost<br />related to it. Todays the engineering insurance is an appropriate and<br />durable protection for reducing the risks related to the industrial machinery.<br />This kind of insurance covers a part of maintenance costs. Previous<br />researches did not consider the effect of engineering insurance<br />on maintenance scheduling while it affects the total cost function of maintenance scheduling seriously. Given the above-mentioned remarks,<br />this paper introduces for the first time a new scheduling of preventive<br />maintenance with considering total cost and total reliability of the system<br />in which the effect of engineering insurance has been taken into<br />account. Due to the uncertainty in the input parameters, which are<br />very common in application, the paper proposed the application of robust<br />design approaches. To solve this multi objective model, first it has<br />been transformed into a single objective model by using global criterion<br />and the resultant model is solved through genetic algorithm. The<br />results show the magnitude effect of engineering insurance on maintenance<br />scheduling. Therefore, neglecting the importance of engineering<br />insurance leads to an inefficient scheduling maintenance.en_US
dc.languageEnglish
dc.language.isoen_US
dc.publisherIslamic Azad University Shiraz Branchen_US
dc.relation.ispartofJournal of System Managementen_US
dc.subjectPreventive maintenanceen_US
dc.subjectengineering insuranceen_US
dc.subjectRobust Optimizationen_US
dc.subjectglobal criterion methoden_US
dc.subjectGenetic Algorithmen_US
dc.subjectPareto set solutionsen_US
dc.titleUsing Genetic Algorithm to Robust Multi Objective Optimization of Maintenance Scheduling Considering Engineering Insuranceen_US
dc.typeTexten_US
dc.typeResearch Paperen_US
dc.contributor.departmentDepartment of Industrial Engineering, Amirkabir University of Technology, Iran, Tehranen_US
dc.contributor.departmentDepartment of Industrial Engineering, Amirkabir University of Technology, Iran, Tehranen_US
dc.contributor.departmentDepartment of Industrial Engineering, Amirkabir University of Technology, Iran, Tehranen_US
dc.citation.volume2
dc.citation.issue1
dc.citation.spage1
dc.citation.epage19


فایل‌های این مورد

فایل‌هااندازهقالبمشاهده

فایلی با این مورد مرتبط نشده است.

این مورد در مجموعه‌های زیر وجود دارد:

نمایش مختصر رکورد