Volume 3, Issue 3
مرور بر اساس
ارسال های اخیر
-
Joint Optimization of Star P-hub Median Problem and Seat Inventory Control Decisions Considering a Hybrid Routing Transportation System
(Kharazmi University, 2016-11-01)In this paper, we study the problem of integrated capacitated hub location problem and seat inventory control considering concept and techniques of revenue management. We consider an airline company maximizes its revenue ...
-
The Identifying, Evaluating and Prioritizing the Factors Affecting Customers’ Satisfaction with E-service Centers of Iran's Police
(Kharazmi University, 2016-11-01)The present research is classified as an applied one employing a descriptive survey design to describe the status quo of the factors affecting customers' satisfaction with the E-service centers of Iran's police, known as ...
-
A Scheduling Model for the Re-entrant Manufacturing System and Its Optimization by NSGA-II
(Kharazmi University, 2016-11-01)In this study, a two-objective mixed-integer linear programming model (MILP) for multi-product re-entrant flow shop scheduling problem has been designed. As a result, two objectives are considered. One of them is maximization ...
-
Competitive Supply Chain Network Design Considering Marketing Strategies: A Hybrid Metaheuristic Algorithm
(Kharazmi University, 2016-11-01)In this paper, a comprehensive model is proposed to design a network for multi-period, multi-echelon, and multi-product inventory controlled the supply chain. Various marketing strategies and guerrilla marketing approaches ...
-
Defining Robust Recovery Solutions for Preserving Service Quality during Rail/Metro Systems Failure
(Kharazmi University, 2016-11-01)In this paper, we propose a sensitivity analysis for evaluating the effectiveness of recovery solutions in the case of disturbed rail operations. Indeed, when failures or breakdowns occur during daily service, new strategies ...
-
The Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem
(Kharazmi University, 2016-11-01)This paper presents the formulation and solution of the Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem. The focus of the proposed method is not on finding a single optimal solution, instead ...
-
Modeling and Solving the Multi-depot Vehicle Routing Problem with Time Window by Considering the Flexible end Depot in Each Route
(Kharazmi University, 2016-11-01)This paper considers the multi-depot vehicle routing problem with time window in which each vehicle starts from a depot and there is no need to return to its primary depot after serving customers. The mathematical model ...



