A Memetic Algorithm for Hybrid Flowshops with Flexible Machine Availability Constraints
(QIAU, 2009-04-01)This paper considers the problem of scheduling hybrid flowshops with machine availability constraints (MAC) to minimize makespan. The paper deals with a specific case of MAC caused by preventive maintenance (PM) operations. ...
-
New Heuristic Algorithms for Solving Single-Vehicle and Multi-Vehicle Generalized Traveling Salesman Problems (GTSP)
(QIAU, 2009-04-01)Among numerous NP-hard problems, the Traveling Salesman Problem (TSP) has been one of the most explored, yet unknown one. Even a minor modification changes the problem’s status, calling for a different solution. The ...
-
A Hybrid Meta-Heuristic Method to Optimize Bi-Objective Single Period Newsboy Problem with Fuzzy Cost and Incremental Discount
(QIAU, 2009-04-01)In this paper the real-world occurrence of the multiple-product multiple-constraint single period newsboy problem with two objectives, in which there is incremental discounts on the purchasing prices, is investigated. The ...
-
Using Markov Chain to Analyze Production Lines Systems with Layout Constraints
(QIAU, 2009-04-01)There are some problems with estimating the time required for the manufacturing process of products, especially when there is a variable serving time, like control stage. These problems will cause overestimation of process ...
-
A Mathematical Model for a Flow Shop Scheduling Problem with Fuzzy Processing Times
(QIAU, 2009-04-01)This paper presents a mathematical model for a flow shop scheduling problem consisting of m machine and n jobs with fuzzy processing times that can be estimated as independent stochastic or fuzzy numbers. In the traditional ...
-
A New Approach in Job Shop Scheduling: Overlapping Operation
(QIAU, 2009-04-01)In this paper, a new approach to overlapping operations in job shop scheduling is presented. In many job shops, a customer demand can be met in more than one way for each job, where demand determines the quantity of each ...
-
An Iterated Greedy Algorithm for Flexible Flow Lines with Sequence Dependent Setup Times to Minimize Total Weighted Completion Time
(QIAU, 2009-04-01)This paper explores the flexile flow lines where setup times are sequence- dependent. The optimization criterion is the minimization of total weighted completion time. We propose an iterated greedy algorithm (IGA) to tackle ...
-
Propagation Models and Fitting Them for the Boolean Random Sets
(QIAU, 2009-04-01)In order to study the relationship between random Boolean sets and some explanatory variables, this paper introduces a Propagation model. This model can be applied when corresponding Poisson process of the Boolean model ...