dc.contributor.authorShahriari, Mohammadrezaen_US
dc.contributor.authorShoja, Naghien_US
dc.contributor.authorEbrahimi Zade, Amiren_US
dc.contributor.authorBarak, Sasanen_US
dc.contributor.authorSharifi, Manien_US
dc.date.accessioned1399-07-22T18:15:51Zfa_IR
dc.date.accessioned2020-10-13T18:15:52Z
dc.date.available1399-07-22T18:15:51Zfa_IR
dc.date.available2020-10-13T18:15:52Z
dc.date.issued2016-09-01en_US
dc.date.issued1395-06-11fa_IR
dc.date.submitted2020-10-04en_US
dc.date.submitted1399-07-13fa_IR
dc.identifier.citationShahriari, Mohammadreza, Shoja, Naghi, Ebrahimi Zade, Amir, Barak, Sasan, Sharifi, Mani. (2016). JIT single machine scheduling problem with periodic preventive maintenance. Journal of Industrial Engineering, International, 12(3)en_US
dc.identifier.issn1735-5702
dc.identifier.issn2251-712X
dc.identifier.urihttp://jiei.azad.ac.ir/article_676620.html
dc.identifier.urihttps://iranjournals.nlai.ir/handle/123456789/434513
dc.description.abstractThis article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to maintain the quality of the products, there is a limitation on the maximum number of allowable jobs in each period. The proposed bi-objective mixed integer model minimizes total earliness-tardiness and makespan simultaneously. Due to the computational complexity of the problem, multi-objective particle swarm optimization (MOPSO) algorithm is implemented. Also, as well as MOPSO, two other optimization algorithms are used for comparing the results. Eventually, Taguchi method with metrics analysis is presented to tune the algorithms' parameters and a multiple criterion decision making technique based on the technique for order of preference by similarity to ideal solution is applied to choose the best algorithm. Comparison results confirmed the supremacy of MOPSO to the other algorithms.en_US
dc.format.extent1613
dc.format.mimetypeapplication/pdf
dc.languageEnglish
dc.language.isoen_US
dc.publisherIslamic Azad University, South Tehran Branchen_US
dc.relation.ispartofJournal of Industrial Engineering, Internationalen_US
dc.subjectScheduling . Single machine . Periodic maintenance . Total earlinessen_US
dc.subjecttardiness . Multien_US
dc.subjectobjective optimization . MCDMen_US
dc.titleJIT single machine scheduling problem with periodic preventive maintenanceen_US
dc.typeTexten_US
dc.contributor.departmentFaculty of Management, South Tehran Branch, Islamic Azad University, Tehran, Iranen_US
dc.contributor.departmentDepartment of Industrial Engineering, Firoozkooh Branch, Islamic Azad University, Firoozkooh, Iranen_US
dc.contributor.departmentDepartment of Industrial Engineering, Amirkabir University of Technology, Tehran, Iranen_US
dc.contributor.departmentFaculty of Economics, Technical University of Ostrava, Ostrava, Czech Republicen_US
dc.contributor.departmentFaculty of Industrial and Mechanical Engineering, Qazvin Branch, Islamic Azad University, Qazvin, Iranen_US
dc.citation.volume12
dc.citation.issue3