نمایش مختصر رکورد

dc.contributor.authorZaree, Mostafaen_US
dc.contributor.authorKamranrad, Rezaen_US
dc.contributor.authorZaree, Mojtabaen_US
dc.contributor.authorEmami, Imanen_US
dc.date.accessioned1399-07-09T04:15:40Zfa_IR
dc.date.accessioned2020-09-30T04:15:40Z
dc.date.available1399-07-09T04:15:40Zfa_IR
dc.date.available2020-09-30T04:15:40Z
dc.date.issued2020-08-01en_US
dc.date.issued1399-05-11fa_IR
dc.date.submitted2020-02-28en_US
dc.date.submitted1398-12-09fa_IR
dc.identifier.citationZaree, Mostafa, Kamranrad, Reza, Zaree, Mojtaba, Emami, Iman. (2020). Project scheduling optimization for contractor’s Net present value maximization using meta-heuristic algorithms: A case study. Journal of Industrial Engineering and Management Studies, 7(2), 36-55. doi: 10.22116/jiems.2020.221672.1342en_US
dc.identifier.issn2476-308X
dc.identifier.issn2476-3098
dc.identifier.urihttps://dx.doi.org/10.22116/jiems.2020.221672.1342
dc.identifier.urihttp://jiems.icms.ac.ir/article_111666.html
dc.identifier.urihttps://iranjournals.nlai.ir/handle/123456789/257866
dc.description.abstractToday's competitive conditions have caused the projects to be carried out in the least possible time with limited resources. Therefore, managing and scheduling a project is a necessity for the project. The timing of a project is to specify a sequence of times for a series of related activities. According to their priority and their latency, so that between the time the project is completed and the total cost is balanced. Given the balance between time and cost, and to achieve these goals, there are several options that should be considered among existing options and ultimately the best option to perform activities to complete the project. In this research, a mathematical model of project scheduling with multiple goals based on cost patterns and consideration of resource constraints is presented, and this problem is considered as a problem for NP-hard issues in family hybrid optimization. GA، PSO and SA Meta-heuristic algorithms are used to solve the proposed model in project scheduling and the results are compared with each other.en_US
dc.format.extent1070
dc.format.mimetypeapplication/pdf
dc.languageEnglish
dc.language.isoen_US
dc.publisherIran Center for Management Studiesen_US
dc.relation.ispartofJournal of Industrial Engineering and Management Studiesen_US
dc.relation.isversionofhttps://dx.doi.org/10.22116/jiems.2020.221672.1342
dc.subjectProject schedulingen_US
dc.subjectNPV maximizingen_US
dc.subjectpayment patternsen_US
dc.subjectResource constraintsen_US
dc.subjectmeta-heuristic algorithmsen_US
dc.titleProject scheduling optimization for contractor’s Net present value maximization using meta-heuristic algorithms: A case studyen_US
dc.typeTexten_US
dc.typeOriginal Articleen_US
dc.contributor.departmentImam Hossein University of Technology, Tehran, Iran.en_US
dc.contributor.departmentDepartment of Industrial Engineering, Faculty of Engineering, Semnan University, Semnan, Iran.en_US
dc.contributor.departmentIslamic Azad University of South Tehran, Tehran, Iran.en_US
dc.contributor.departmentDepartment of Industrial Engineering, Eyvanakey University, Eyvanakey, Iran.en_US
dc.citation.volume7
dc.citation.issue2
dc.citation.spage36
dc.citation.epage55


فایل‌های این مورد

Thumbnail

این مورد در مجموعه‌های زیر وجود دارد:

نمایش مختصر رکورد