نمایش مختصر رکورد

dc.contributor.authorMalekiyan, Yaseren_US
dc.contributor.authorMirmohammadi, Seyed Hamiden_US
dc.date.accessioned1399-07-09T04:14:48Zfa_IR
dc.date.accessioned2020-09-30T04:14:48Z
dc.date.available1399-07-09T04:14:48Zfa_IR
dc.date.available2020-09-30T04:14:48Z
dc.date.issued2017-07-01en_US
dc.date.issued1396-04-10fa_IR
dc.date.submitted2016-05-07en_US
dc.date.submitted1395-02-18fa_IR
dc.identifier.citationMalekiyan, Yaser, Mirmohammadi, Seyed Hamid. (2017). Minimizing Net Present Value of Costs in Lot-Sizing in a Two-Echelon Inventory System. Advances in Industrial Engineering, 51(2), 251-264. doi: 10.22059/jieng.2017.62215en_US
dc.identifier.issn2423-6896
dc.identifier.issn2423-6888
dc.identifier.urihttps://dx.doi.org/10.22059/jieng.2017.62215
dc.identifier.urihttps://jieng.ut.ac.ir/article_62215.html
dc.identifier.urihttps://iranjournals.nlai.ir/handle/123456789/257581
dc.description.abstractIn this paper, a two-echelon supplier-manufacturer system has been studied through net present value (NPV) approach. The production rate is finite and constant in both echelons. Also it is assumed that there is a lead-time between the first echelon and it is getting to the second echelon. It is also assumed that the lot-size of manufacturer (second echelon) is m times larger than the supplier's factors (first echelon), and the supplier can receive wares (the raw material) from the manufacturer in a cycle through several shipments, due to the point that shortage is not allowed. So, it is supposed that the supplier's production rate is greater than manufacturer's. The aim is to determine the optimal lot-size of each echelon such that the NPV of the total cost of system is minimized. After approximating the NPV objective function via Maclaurin expansion in both zero and non-zero lead-time cases, an exact algorithm is presented to find optimal solution of the presented model. Based on the results, the two approaches of average cost and NPV do not lead to a same result, and non-equivalency is occurred in this case.en_US
dc.format.extent754
dc.format.mimetypeapplication/pdf
dc.languageEnglish
dc.language.isoen_US
dc.publisherUniversity of Tehranen_US
dc.relation.ispartofAdvances in Industrial Engineeringen_US
dc.relation.isversionofhttps://dx.doi.org/10.22059/jieng.2017.62215
dc.subjectEconomic production quantityen_US
dc.subjectLead-timeen_US
dc.subjectTime values of moneyen_US
dc.subjectTwo-Echelon inventory systemen_US
dc.subjectLogistics and Supply Chain and Inventory Controlen_US
dc.titleMinimizing Net Present Value of Costs in Lot-Sizing in a Two-Echelon Inventory Systemen_US
dc.typeTexten_US
dc.typeResearch Paperen_US
dc.contributor.departmentDepartment of Industrial and Systems Engineering, Isfahan University of Technology, Isfahan, Iranen_US
dc.contributor.departmentDepartment of Industrial and Systems Engineering, Isfahan University of Technology, Isfahan, Iranen_US
dc.citation.volume51
dc.citation.issue2
dc.citation.spage251
dc.citation.epage264


فایل‌های این مورد

Thumbnail

این مورد در مجموعه‌های زیر وجود دارد:

نمایش مختصر رکورد