نمایش مختصر رکورد

dc.contributor.authorPanahi, Imanen_US
dc.contributor.authorNahavandi, Nasimen_US
dc.date.accessioned1399-07-09T04:14:47Zfa_IR
dc.date.accessioned2020-09-30T04:14:47Z
dc.date.available1399-07-09T04:14:47Zfa_IR
dc.date.available2020-09-30T04:14:47Z
dc.date.issued2017-07-01en_US
dc.date.issued1396-04-10fa_IR
dc.date.submitted2016-07-13en_US
dc.date.submitted1395-04-23fa_IR
dc.identifier.citationPanahi, Iman, Nahavandi, Nasim. (2017). An Efficient Imperialist Competitive Algorithm for Resource Constrained Project Scheduling Problem. Advances in Industrial Engineering, 51(2), 161-174. doi: 10.22059/jieng.2017.62210en_US
dc.identifier.issn2423-6896
dc.identifier.issn2423-6888
dc.identifier.urihttps://dx.doi.org/10.22059/jieng.2017.62210
dc.identifier.urihttps://jieng.ut.ac.ir/article_62210.html
dc.identifier.urihttps://iranjournals.nlai.ir/handle/123456789/257576
dc.description.abstractIn this paper, a new algorithm based on the framework of the imperialist competitive algorithm for solving resource constrained project scheduling problem (RCPSP) will be proposed. In this problem, the activities are scheduled based on the resource and precedence relationships constraints in a way that the makes pan will be minimized. In order to model the assimilation process, a uniform crossover has been used, and to avoid premature convergence of the proposed algorithm, two revolution operators including one point revolution and multi-point revolution will be introduced. Also, in order to enhance the exploitation ability, a combined local search including permutation based local search (PBLS) and forward-backward improvement (FBI) is performed. The algorithm parameters are determined by designing Taguchi experiment, and the efficiency of proposed ICA is demonstrated by solving PSPLIB problems. Computational results and comparisons with some existing algorithms show that the proposed algorithm can produce near-optimal solution for small problems and competitive solution for large ones.en_US
dc.format.extent1099
dc.format.mimetypeapplication/pdf
dc.languageEnglish
dc.language.isoen_US
dc.publisherUniversity of Tehranen_US
dc.relation.ispartofAdvances in Industrial Engineeringen_US
dc.relation.isversionofhttps://dx.doi.org/10.22059/jieng.2017.62210
dc.subjectImperialist competitive algorithmen_US
dc.subjectOptimization Algorithmen_US
dc.subjectResource constrained project scheduling problemen_US
dc.subjectOperation Research and Project Managementen_US
dc.titleAn Efficient Imperialist Competitive Algorithm for Resource Constrained Project Scheduling Problemen_US
dc.typeTexten_US
dc.typeResearch Paperen_US
dc.contributor.departmentFaculty of Industrial and Systems Engineering, Tarbiat Modares University, Tehran, Iranen_US
dc.contributor.departmentFaculty of Industrial and Systems Engineering, Tarbiat Modares University, Tehran, Iranen_US
dc.citation.volume51
dc.citation.issue2
dc.citation.spage161
dc.citation.epage174


فایل‌های این مورد

Thumbnail

این مورد در مجموعه‌های زیر وجود دارد:

نمایش مختصر رکورد