نمایش مختصر رکورد

dc.contributor.authorRabani, Masouden_US
dc.contributor.authorHosseini Aghozi, Nilufaren_US
dc.contributor.authorManavizadeh, Nedaen_US
dc.date.accessioned1399-07-09T04:14:32Zfa_IR
dc.date.accessioned2020-09-30T04:14:32Z
dc.date.available1399-07-09T04:14:32Zfa_IR
dc.date.available2020-09-30T04:14:32Z
dc.date.issued2013-04-01en_US
dc.date.issued1392-01-12fa_IR
dc.date.submitted2012-12-01en_US
dc.date.submitted1391-09-11fa_IR
dc.identifier.citationRabani, Masoud, Hosseini Aghozi, Nilufar, Manavizadeh, Neda. (2013). Robust Optimization Approach in Production Planning Problem Considering Rework, Backlogging and Breakdown under Conditions of Uncertainty: an Evolutionary Approach. Advances in Industrial Engineering, 47(1), 25-37. doi: 10.22059/jieng.2013.35508en_US
dc.identifier.issn2423-6896
dc.identifier.issn2423-6888
dc.identifier.urihttps://dx.doi.org/10.22059/jieng.2013.35508
dc.identifier.urihttps://jieng.ut.ac.ir/article_35508.html
dc.identifier.urihttps://iranjournals.nlai.ir/handle/123456789/257501
dc.description.abstractIn this paper, we consider a multi-site production planning problem subject to uncertainty in demand and workforce expenses. In our new mathematical model, we presented a production planning system considering failure in rework and breakdown. We also survey human workforce allocation and its expenses which are considered uncertain due to some tradeoff between company's benefits and workforce union's advantages. We presented a new robust particle swarm optimization to propose a model with the ability of handling uncertainties. Firstly, we apply the presented robust optimization to handle demand uncertainty separately, and then we extended our model to regard both uncertainties simultaneously. To show the practicability of the proposed algorithm, we solved a real problem in an industrial case study. We also analyzed the most important parameters in the presented robust model to find out which level of uncertainty has less constraint violation and determine the maximum budget of uncertainties that could be considered in the proposed model to expect acceptable optimal objective. The results showed that the proposed model can prepare a promising approach to fulfill an efficient production planning in a multi-site production planning.en_US
dc.format.extent888
dc.format.mimetypeapplication/pdf
dc.languageEnglish
dc.language.isoen_US
dc.publisherUniversity of Tehranen_US
dc.relation.ispartofAdvances in Industrial Engineeringen_US
dc.relation.isversionofhttps://dx.doi.org/10.22059/jieng.2013.35508
dc.subjectBackloggingen_US
dc.subjectRobust optimizationen_US
dc.subjectUncertainty in labor costen_US
dc.subjectProduction Planningen_US
dc.subjectFailureen_US
dc.subjectReworken_US
dc.subjectparticle swarm optimizationen_US
dc.subjectUncertainty in demanden_US
dc.titleRobust Optimization Approach in Production Planning Problem Considering Rework, Backlogging and Breakdown under Conditions of Uncertainty: an Evolutionary Approachen_US
dc.typeTexten_US
dc.typeResearch Paperen_US
dc.contributor.departmentSchool of Industrial Engineering, College of Engineering, University of Tehran, I.R. Iranen_US
dc.contributor.departmentSchool of Industrial Engineering, College of Engineering, University of Tehran, I.R. Iranen_US
dc.contributor.departmentDept of Industrial Engineering, University of Alzahra, Tehran, Iranen_US
dc.citation.volume47
dc.citation.issue1
dc.citation.spage25
dc.citation.epage37


فایل‌های این مورد

Thumbnail

این مورد در مجموعه‌های زیر وجود دارد:

نمایش مختصر رکورد