نمایش مختصر رکورد

dc.contributor.authorDamghani, K.en_US
dc.contributor.authorTavakkoli-Moghaddam, Rezaen_US
dc.contributor.authorTabari, M.en_US
dc.date.accessioned1399-07-09T04:14:28Zfa_IR
dc.date.accessioned2020-09-30T04:14:28Z
dc.date.available1399-07-09T04:14:28Zfa_IR
dc.date.available2020-09-30T04:14:28Z
dc.date.issued2011-04-01en_US
dc.date.issued1390-01-12fa_IR
dc.identifier.citationDamghani, K., Tavakkoli-Moghaddam, Reza, Tabari, M.. (2011). Solving Resource Constraint Project Scheduling Problems Using Modified Ant Colony Optimization. Advances in Industrial Engineering, 45(1), 59-69.en_US
dc.identifier.issn2423-6896
dc.identifier.issn2423-6888
dc.identifier.urihttps://jieng.ut.ac.ir/article_23239.html
dc.identifier.urihttps://iranjournals.nlai.ir/handle/123456789/257473
dc.description.abstractResource Constraints Project Scheduling Problem (RSPSP) seeks proper sequence of implementation of project activities in a way that the precedence relations and different type of resource constraints are met concurrently. RCPSP tends to optimize some measurement function as make-span, cost of implementation, number of tardy tasks and etc. As RCPSP is assumed as an NP-Hard problem so, different meta-heuristic approaches have been proposed to solve different variants of it. In this paper, a modified Ant Colony Optimization (ACO) approach has been developed to deal with RCPSP. The definition of probabilistic selection rule has been modified in proposed approach in favor of better performance. Moreover, the parameters of algorithm have been determined in an adaptive manner and the stagnation behavior has been prevented in high iterations of algorithm. Uncertainty of parameters of RCPSP has also been discussed. The proposed algorithm has been coded using Visual Basic software and tested on benchmark instance in this area. The results are promising and have been compared with optimal or best known solutions.en_US
dc.format.extent311
dc.format.mimetypeapplication/pdf
dc.languageEnglish
dc.language.isoen_US
dc.publisherUniversity of Tehranen_US
dc.relation.ispartofAdvances in Industrial Engineeringen_US
dc.subjectAnt colony Optimizationen_US
dc.subjectmeta-heuristic methodsen_US
dc.subjectResource constraint project schedulingen_US
dc.titleSolving Resource Constraint Project Scheduling Problems Using Modified Ant Colony Optimizationen_US
dc.typeTexten_US
dc.citation.volume45
dc.citation.issue1
dc.citation.spage59
dc.citation.epage69


فایل‌های این مورد

Thumbnail

این مورد در مجموعه‌های زیر وجود دارد:

نمایش مختصر رکورد