نمایش مختصر رکورد

dc.contributor.authorAliabadi, Mohammaden_US
dc.contributor.authorJolai, Fariborzen_US
dc.contributor.authorMehdizadeh, Esmaeilen_US
dc.contributor.authorJenabi, Masouden_US
dc.date.accessioned1399-07-09T03:58:34Zfa_IR
dc.date.accessioned2020-09-30T03:58:34Z
dc.date.available1399-07-09T03:58:34Zfa_IR
dc.date.available2020-09-30T03:58:34Z
dc.date.issued2011-04-01en_US
dc.date.issued1390-01-12fa_IR
dc.date.submitted2010-03-06en_US
dc.date.submitted1388-12-15fa_IR
dc.identifier.citationAliabadi, Mohammad, Jolai, Fariborz, Mehdizadeh, Esmaeil, Jenabi, Masoud. (2011). A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times. Journal of Industrial and Systems Engineering, 5(1), 1-19.en_US
dc.identifier.issn1735-8272
dc.identifier.urihttp://www.jise.ir/article_4038.html
dc.identifier.urihttps://iranjournals.nlai.ir/handle/123456789/251900
dc.description.abstractMany authors have examined lot sizing, scheduling and sequence of multi-product flow shops, but most of them have assumed that set up times are independent of sequence. Whereas dependence of set up times to sequence is more common in practice. Hence, in this paper, we examine the discussed problem with hypothesis of dependence of set up times to sequence and cyclic schedule policy in basic period form. To do so, a mixed integer non-linear programming (NLP) model is developed for this problem. To solve the model these techniques are applied: Heuristic G-group for determining the frequency of item production and assigning product to periods and three meta heuristic methods including hybrid Particle swarm optimization , hybrid Vibration damping optimization hybrid genetic algorithm are used to determine the sequence and economic lot sizes of each item. In addition, to compare these methods, some random problems are produced and computation of them shows the substantial superiority of hybrid Particle swarm optimization.en_US
dc.format.extent552
dc.format.mimetypeapplication/pdf
dc.languageEnglish
dc.language.isoen_US
dc.publisherIranian Institute of Industrial Engineeringen_US
dc.relation.ispartofJournal of Industrial and Systems Engineeringen_US
dc.subjectFlow shopen_US
dc.subjectDetermining lot sizesen_US
dc.subjectFinite planning horizonen_US
dc.subjectHybrid particle swarm optimizationen_US
dc.subjectBasic perioden_US
dc.subjectMetaheaurestic Techniquesen_US
dc.subjectProduction Planning & Controlen_US
dc.subjectSchedulingen_US
dc.titleA Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up timesen_US
dc.typeTexten_US
dc.typeResearch Paperen_US
dc.contributor.departmentDepartment of Industrial Engineering, Islamic Azad University of Qazvin, Qazvin, Iranen_US
dc.contributor.departmentDepartment of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iranen_US
dc.contributor.departmentDepartment of Industrial Engineering, Islamic Azad University of Qazvin, Qazvin, Iranen_US
dc.contributor.departmentDepartment of Industrial Engineering, Amirkabir University of Technology, Tehran, Iranen_US
dc.citation.volume5
dc.citation.issue1
dc.citation.spage1
dc.citation.epage19


فایل‌های این مورد

Thumbnail

این مورد در مجموعه‌های زیر وجود دارد:

نمایش مختصر رکورد