Volume 4, Issue 1
مرور بر اساس
ارسال های اخیر
- 
Determining Economic Order Quantity (EOQ) with Increase in a Known Price under Uncertainty through Parametric Non-Linear Programming Approach (2019-06-01)Constant unit procurement cost is one of the main assumptions in the classic inventory control policies. In the realistic world and practice, suppliers sometimes face increase in the price of a known item. In this paper, ...
 
- 
Robust Economic-Statistical Design of Acceptance Control Chart (2019-06-01)Acceptance control charts (ACC), as an effective tool for monitoring highly capable processes, establish control limits based on specification limits when the fluctuation of the process mean is permitted or inevitable. For ...
 
- 
A Multi-Objective Optimization Model for Split Pollution Routing Problem with Controlled Indoor Activities in Cross Docking under Uncertainty (2019-06-01)Cross docking is a logistics strategy that strives to reduce inventory holding costs, shipping costs, and delays in delivering the products. In this research, an optimization model is presented for split loading and unloading ...
 
- 
Stock Evaluation under Mixed Uncertainties Using Robust DEA Model (2019-06-01)Data Envelopment Analysis (DEA) is one of the popular and applicable techniques for assessing and ranking the stocks or other financial assets. It should be noted that in the financial markets, most of the times, the inputs ...
 
- 
Using Metaheuristic Algorithms Combined with Clustering Approach to Solve a Sustainable Waste Collection Problem (2019-06-01)Sustainability is a monumental issue that should be considered in designing a logistics system. In order to incorporate sustainability concepts in our study, a waste collection problem with economic, environmental, and ...
 
- 
Comparing Mixed-Integer and Constraint Programming for the No-Wait Flow Shop Problem with Due Date Constraints (2019-06-01)The impetus for this research was examining a flow shop problem in which tasks were expected to be successively carried out with no time interval (i.e., no wait time) between them. For this reason, they should be completed ...
 



