نمایش مختصر رکورد

dc.contributor.authorاحمدرضا رئيسيen_US
dc.contributor.authorراضيه ستاريen_US
dc.date.accessioned1399-12-02T04:56:21Zfa_IR
dc.date.accessioned2021-02-20T04:56:31Z
dc.date.available1399-12-02T04:56:21Zfa_IR
dc.date.available2021-02-20T04:56:31Z
dc.date.issued2012-06-06en_US
dc.date.issued1391-03-17fa_IR
dc.date.submitted2012-06-06en_US
dc.date.submitted1391-03-17fa_IR
dc.identifier.citation(1391). مدیریت اطلاعات سلامت, 9(2)fa_IR
dc.identifier.issn1735-7853
dc.identifier.issn1735-9813
dc.identifier.urihttp://him.mui.ac.ir/index.php/him/article/view/623
dc.identifier.urihttps://iranjournals.nlai.ir/handle/123456789/749358
dc.description.abstractIntroduction: In health care services, preventing problems and failures is more efficient than concentrating on correcting them. Repairs are always expensive, as they require highly specialized personnel and costly spare parts. Regular inspecting and servicing, using manual services and checklists, would maximize the impact of maintenance and minimize the costs. It is thus important to introduce a planned preventive maintenance (PPM) system to the hospitals. Methods: This quantitative-qualitative research used a Delphi survey to assess 23 medical engineers and managers at hospitals affiliated to Isfahan University of Medical Sciences (Isfahan, Iran) in 2010. Using interviews, the requirements were categorized into 4 groups of structural, human resources, financial, and equipments. A Delphi survey was obtained according to the results. A final questionnaire based on a Likert scale with a Cronbach's alpha of 92% was used to collect data.  The data was then analyzed by SPSS. Results: Medical engineers and managers prioritized the requirements as structural needs (preparing appropriate organization for repairing and maintenance activity in hospitals and treatment center and cultivation of the plan in the hospitals), human resources (all management personnel should have true belief in the plan), financial needs (allocating specific budget for teaching managers and nurses), and application needs (providing a specific checklist for medical equipments). Conclusion: Medical engineers are definitely needed to be available in all hospitals affiliated to the university. A unit for following preventive maintenance programs, and creating sympathy and cooperation between managers and engineers is also of high importance. Keywords: Need Assessment; Preventive Maintenance; Requirements.en_US
dc.languageEnglish
dc.language.isoen_US
dc.publisherدانشگاه علوم پزشکی اصفهانfa_IR
dc.relation.ispartofمدیریت اطلاعات سلامتfa_IR
dc.titleنیازسنجی الزامات استقرار برنامه‌ی نگهداری پیشگیرانه از دیدگاه مدیران بیمارستان و مهندسان تجهیزات پزشكی بیمارستان‌ها و واحدهای ستادیen_US
dc.typeTexten_US
dc.contributor.departmentاستاديار، مديريت اطلاعات بهداشتي درماني، مرکز تحقيقات مديريت و اقتصاد سلامت، دانشگاه علوم پزشکي اصفهان، اصفهان، ايرانen_US
dc.contributor.departmentکارشناس، مديريت خدمات بهداشتي درماني، دانشگاه علوم پزشکي اصفهان، اصفهان، ايرانen_US
dc.citation.volume9
dc.citation.issue2


فایل‌های این مورد

فایل‌هااندازهقالبمشاهده

فایلی با این مورد مرتبط نشده است.

این مورد در مجموعه‌های زیر وجود دارد:

نمایش مختصر رکورد