• ثبت نام
    • ورود به سامانه
    مشاهده مورد 
    •   صفحهٔ اصلی
    • نشریات فارسی
    • مدیریت اطلاعات سلامت
    • دوره 9, شماره 2
    • مشاهده مورد
    •   صفحهٔ اصلی
    • نشریات فارسی
    • مدیریت اطلاعات سلامت
    • دوره 9, شماره 2
    • مشاهده مورد
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    نیازسنجی الزامات استقرار برنامه‌ی نگهداری پیشگیرانه از دیدگاه مدیران بیمارستان و مهندسان تجهیزات پزشكی بیمارستان‌ها و واحدهای ستادی

    (ندگان)پدیدآور
    احمدرضا رئيسيراضيه ستاري
    Thumbnail
    نوع مدرک
    Text
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    Introduction: In health care services, preventing problems and failures is more efficient than concentrating on correcting them. Repairs are always expensive, as they require highly specialized personnel and costly spare parts. Regular inspecting and servicing, using manual services and checklists, would maximize the impact of maintenance and minimize the costs. It is thus important to introduce a planned preventive maintenance (PPM) system to the hospitals. Methods: This quantitative-qualitative research used a Delphi survey to assess 23 medical engineers and managers at hospitals affiliated to Isfahan University of Medical Sciences (Isfahan, Iran) in 2010. Using interviews, the requirements were categorized into 4 groups of structural, human resources, financial, and equipments. A Delphi survey was obtained according to the results. A final questionnaire based on a Likert scale with a Cronbach's alpha of 92% was used to collect data.  The data was then analyzed by SPSS. Results: Medical engineers and managers prioritized the requirements as structural needs (preparing appropriate organization for repairing and maintenance activity in hospitals and treatment center and cultivation of the plan in the hospitals), human resources (all management personnel should have true belief in the plan), financial needs (allocating specific budget for teaching managers and nurses), and application needs (providing a specific checklist for medical equipments). Conclusion: Medical engineers are definitely needed to be available in all hospitals affiliated to the university. A unit for following preventive maintenance programs, and creating sympathy and cooperation between managers and engineers is also of high importance. Keywords: Need Assessment; Preventive Maintenance; Requirements.

    شماره نشریه
    2
    تاریخ نشر
    2012-06-06
    1391-03-17
    ناشر
    دانشگاه علوم پزشکی اصفهان
    سازمان پدید آورنده
    استاديار، مديريت اطلاعات بهداشتي درماني، مرکز تحقيقات مديريت و اقتصاد سلامت، دانشگاه علوم پزشکي اصفهان، اصفهان، ايران
    کارشناس، مديريت خدمات بهداشتي درماني، دانشگاه علوم پزشکي اصفهان، اصفهان، ايران

    شاپا
    1735-7853
    1735-9813
    URI
    http://him.mui.ac.ir/index.php/him/article/view/623
    https://iranjournals.nlai.ir/handle/123456789/749358

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب