• ثبت نام
    • ورود به سامانه
    مشاهده مورد 
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • International Journal of Health Policy and Management
    • Volume 7, Issue 10
    • مشاهده مورد
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • International Journal of Health Policy and Management
    • Volume 7, Issue 10
    • مشاهده مورد
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Challenges and Prospects for Integrating the Assessment of Health Impacts in the Licensing Process of Large Capital Project in Brazil

    (ندگان)پدیدآور
    de Souza Hacon, SandraPérissé, André Reynaldo SantosSimos, JeanCantoreggi, Nicola LucaWinkler, Mirko Severin
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    391.7کیلوبایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Perspective
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    Brazil was one of the first countries in Latin America to institutionalize a National Environmental Policy in 1981, including the environmental impact assessment (EIA) process of economic activities with anticipated impacts on the environment. Today, EIA practice in Brazil comes with a number of limitations: it is constrained by its environmental advocacy role; application is strongly oriented towards large capital projects; and social responsibility considerations are only partially included. Consequently, EIA studies mainly address issues connected to localised and direct environmental impacts, largely ignoring any socio-economic and health impacts. This perspective paper highlights limitations of current EIA practice in Brazil with a focus on health considerations in impact assessment. While recognizing the positive impact to municipalities where large capital projects are being developed and operated, adverse impacts on health are a reality with measurable evidence in Brazil. Therefore, we argue that specificities on how to systematically assess and monitor potential health impacts cannot remain invisible in the Brazilian legislation, as currently seen in the reformulation of the licensing process in the country. The process of better integrating the assessment of health impacts in the licensing process of large capital project in Brazil must, however, not be based on the imposition of an external model but should be promoted by internal stakeholders from the environmental and health sector, incorporating the experiences gained in various case studies from all over the country
    کلید واژگان
    Health Impact Assessment
    Health Policy
    Large Capital Projects
    Brazil
    Public Health

    شماره نشریه
    10
    تاریخ نشر
    2018-10-01
    1397-07-09
    ناشر
    Kerman University of Medical Sciences
    سازمان پدید آورنده
    Escola Nacional de Saúde Pública Sérgio Arouca (Ensp), Fundação Oswaldo Cruz (Fiocruz), Rio de Janeiro, Brazil
    Escola Nacional de Saúde Pública Sérgio Arouca (Ensp), Fundação Oswaldo Cruz (Fiocruz), Rio de Janeiro, Brazil
    Institute of Global Health, University of Geneva, Genève, Switzerland
    Institute of Global Health, University of Geneva, Genève, Switzerland
    Swiss Tropical and Public Health Institute, Basel, Switzerland

    شاپا
    2322-5939
    URI
    https://dx.doi.org/10.15171/ijhpm.2018.58
    https://www.ijhpm.com/article_3511.html
    https://iranjournals.nlai.ir/handle/123456789/82093

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب