• ثبت نام
    • ورود به سامانه
    مشاهده مورد 
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Journal of Optimization in Industrial Engineering
    • Volume 12, Issue 2
    • مشاهده مورد
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Journal of Optimization in Industrial Engineering
    • Volume 12, Issue 2
    • مشاهده مورد
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    A Job Shop Scheduling and Location of Battery Charging Storage for the Automated Guided Vehicles (AGVs)

    (ندگان)پدیدآور
    Dehnavi-Arani, SaeedSabaghian, AliFazli, Mehdi
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    472.4کیلوبایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Original Manuscript
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    When the Automated Guided Vehicles (AGVs) are transferring the parts from one machine to another in a job shop environment, it is possible that AGVsstopon their guidepaths since their batteries are discharged.Consequently, it is essential to establish at least one Battery Charging Storage (BCS) to replace full batteries with empty batteries for the stopped AGVs. Due to non-predictable routes for AGVs in the manufacturing systems, to find the best place toestablish the BCS can impact performance of the system. In this paper, anintegrated mathematical modelof job shop and AGV schedulingwith respect tothe location of a BCS is proposed. The proposed nonlinear model is transformed into a linear form to beefficiently solvedin GAMS software. Finally, several numerical examplesare presented to test the validity of the proposed mathematical model.The results show that the optimal cost and location of BCS can be obtained with respect to the number of AGVs, machines, parts, and other problem parameters. In addition, it is concluded that the increasing number of AGVs in a manufacturing systemcannot be always a suitable policy for reducing the cost because in such conditions.Further to that, the conflict of AGVs may increase leading tothe increase of the makespan. In other words, following the optimal point, increasing AGVs leads to the increase in costs.
    کلید واژگان
    job shop scheduling
    Battery Charging Storage (BCS)
    AGV
    GAMS software
    production scheduling and sequencing

    شماره نشریه
    2
    تاریخ نشر
    2019-07-01
    1398-04-10
    ناشر
    QIAU
    سازمان پدید آورنده
    Department of Industrial Engineering, Yazd University, Yazd, Iran
    Department of Management, Naragh Branch, Islamic Azad University, Naragh, Iran
    Department of Industrial engineering, Iran University of Science and Technology, Tehran, Iran

    شاپا
    2251-9904
    2423-3935
    URI
    https://dx.doi.org/10.22094/joie.2018.543203.1511
    http://www.qjie.ir/article_538504.html
    https://iranjournals.nlai.ir/handle/123456789/57975

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب