• ثبت نام
    • ورود به سامانه
    مشاهده مورد 
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Journal of Optimization in Industrial Engineering
    • Volume 10, Issue 22
    • مشاهده مورد
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Journal of Optimization in Industrial Engineering
    • Volume 10, Issue 22
    • مشاهده مورد
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Development of a novel lot sizing model with variable lead time in supply chain environment

    (ندگان)پدیدآور
    Kumar, JitendraRoy, NirjharMostafaeipour, AliQolipour, Mojtaba
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    5.842 مگابایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Original Manuscript
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    Supply chain management (SCM) addresses the management of materials and information across the entire chain from suppliers to producers, distributors, retailers, and customer. The theory of supply chain management suggests that lead time reduction is a pioneer to the use of market mediation to reduce transaction uncertainty in the chain, which can be conceptualized as the primary goal of supply chain management. In the past few decades, scholars gave ample attention about the impact of inventory on SCM. This paper relates to the development of a lot sizing model for a single component multiple delivery system with variable demand and lead time of a multinational transformer company. Two models and the modification were developed on the basis of the following assumptions. For first model distribution of demand is normal, distribution of procurement lead time is exponential and the quantity is coming in a single lot. For second model distribution of demand is normal distribution of ‘procurement’ and ‘administrative delay’ lead time is exponential and the quantity is coming in a single lot. Modification of the first model has been done by taking the effect of multiple deliveries in the models and correcting the Re-order point as obtained from the previous models. The results were observed by the second model and analysis has been done for different parametric conditions. The effect of multiple deliveries is also taken into account. The optimum re-order point and economic ordering quantity with various different inputs have been discussed.
    کلید واژگان
    SCM (Supply Chain Management)
    Lot size
    Economic Order Quality (EOQ)
    Lead time
    ROP ( Re-order point)
    Production Planning and Control

    شماره نشریه
    22
    تاریخ نشر
    2017-07-01
    1396-04-10
    ناشر
    QIAU
    سازمان پدید آورنده
    Instructor, Mechanical Engineering Department, MNNIT, Allahabad, India
    Professor, Mechanical Engineering Department, MNNIT, Allahabad, India
    Assistant Professor, Industrial Engineering Department, Yazd University, Yazd, Iran
    MSc, Industrial Engineering Department, Yazd University, Yazd, Iran

    شاپا
    2251-9904
    2423-3935
    URI
    https://dx.doi.org/10.22094/joie.2017.275
    http://www.qjie.ir/article_275.html
    https://iranjournals.nlai.ir/handle/123456789/57913

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب