An Exact Algorithm for the Mode Identity Project Scheduling Problem
(ندگان)پدیدآور
Afshar Nadjafi, BehrouzRahimi, AmirKarimi, Hamidنوع مدرک
TextOriginal Manuscript
زبان مدرک
Englishچکیده
In this paper we consider the non-preemptive variant of a multi-mode resource constrained project scheduling problem (MRCPSP) with mode identity, in which a set of project activities is partitioned into disjoint subsets while all activities forming one subset have to be processed in the same mode. We present a depth-first branch and bound algorithm for the resource constrained project scheduling problem with mode identity. The proposed algorithm is extended with some bounding rules to reduce the size of branch and bound tree. Finally, some test problems are solved and their computational results are reported.
کلید واژگان
Project SchedulingBranch and Bound
Mode-Identity
Multi-Mode
Resource Constrained
شماره نشریه
10تاریخ نشر
2012-03-011390-12-11
ناشر
QIAUسازمان پدید آورنده
Assistant Professor, Faculty of Industrial and Mechanical Engineering, Qazvin Branch, Islamic Azad University, Qazvin, IranMSc, Faculty of Industrial and Mechanical Engineering, Qazvin Branch, Islamic Azad University, Qazvin, Iran
MSc, Faculty of Industrial and Mechanical Engineering, Qazvin Branch, Islamic Azad University, Qazvin, Iran
شاپا
2251-99042423-3935




