• ثبت نام
    • ورود به سامانه
    مشاهده مورد 
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Advance Researches in Civil Engineering
    • Volume 2, Issue 3
    • مشاهده مورد
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Advance Researches in Civil Engineering
    • Volume 2, Issue 3
    • مشاهده مورد
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Hydraulic Simulation to Find Bottlenecks and Potential Flood Points in the Main Runoff Collection Channel by HEC-RAS 5 Model (Mianroud Canal, Tehran)

    (ندگان)پدیدآور
    Abbassi, PeymanAminnejad, BabakAhmadi, Hassan
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    1.305 مگابایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Original Article
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    Currently, floods are one of the biggest threats to social security and sustainable development, and are among the most devastating and costly natural hazards. In recent decades, studies on urban flooding have increased and there has been a leap forward in flood risk management. The management of runoff and floods in the metropolis of Tehran is also more important due to its location at the foot of the mountain, leveling the land, occupying the privacy of the Channels, high relative density of housing and population and improper use of the Channels. For this purpose, in this study, the main Channel collecting surface runoff in the second district of Tehran (known as Flood Diversion Channel of West Tehran) was examined. The HEC-RAS 5 model was used for hydraulic simulation to flood the area and identify critical points in the area. Two parameters, speed and depth, were used as important parameters to assess risk. Studies conducted in this study, as well as a general comparison between flood risk zoning methods, show that the use of combined models with different factors in determining flood risk will have more appropriate results. The use of flow energy in flood risk assessment and considering the two components of depth and speed and their targeted combination will lead to the verification of results. In addition to the above, it seems appropriate to provide appropriate zoning for potential flood hazards, to identify safe areas, to provide relief routes, to economically justify reorganization plans, to flood flood-affected lands, and to manage floods.
    کلید واژگان
    Flood Risk Assessment
    flood risk estimation
    plain flood management
    Mianroud Tehran Channel

    شماره نشریه
    3
    تاریخ نشر
    2020-09-01
    1399-06-11
    ناشر
    Papyrus Press
    سازمان پدید آورنده
    PhD Student of Civil Engineering, Construction Management, Islamic Azad University, Roodehen Branch
    assistant Professor, Faculty of Civil Engineering, Islamic Azad University, Roodehen Branch
    Assistant Professor, Faculty of Civil Engineering, Islamic Azad University, Roodehen Branch

    شاپا
    2645-7229
    URI
    https://dx.doi.org/10.30469/arce.2020.117873
    http://www.arce.ir/article_117873.html
    https://iranjournals.nlai.ir/handle/123456789/434317

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب