• ثبت نام
    • ورود به سامانه
    مشاهده مورد 
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • International Journal of Industrial Electronics, Control and Optimization
    • Volume 2, Issue 4
    • مشاهده مورد
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • International Journal of Industrial Electronics, Control and Optimization
    • Volume 2, Issue 4
    • مشاهده مورد
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Practical approach for planning of reliability-centered maintenance in distribution network with considering economic risk function and load uncertainly

    (ندگان)پدیدآور
    yari, amirrezaShakarami, Mahmoud Rezanamdari, farhadMoradi CheshmehBeigi, Hassan
    Thumbnail
    نوع مدرک
    Text
    Original Article
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    Nowadays, the power distribution companies are working in a competitive atmosphere. Therefore, a major goal for electricity distribution managers is to provide the electrical energy with high reliability level with considering the economic issues.The Reliability- centered maintenance (RCM) is an efficient way of realizing this aim and improving the network maintenance processes. This approach is an operative step to improve the reliability of critical equipment and overall system performance which may reduce the costs of utilities.This paper, by using RCM provides a practical model for maintenance scheduling by considering the economic risk function and the budget restriction based on the cost of preventive maintenance (PM) and value of lost load (VOLL). In this method, PM schedules are proposed based on failure causes of different network elements. Studied elements include overhead lines, underground cables and power switches (circuit breaker (CB), manual and remote control switches (RCSs)). Failure cause and average repair time of each element is determined through data mining in geographical information system (GIS) and ENOX. For more realistic modeling and the consideration of the network loads' uncertainties, the fuzzy triangular method is used. Due to the inconsistency between the problem's goals, the non-dominated sorting genetic algorithm (NSGA II) is employed. Results show the effectiveness of the proposed method.
    کلید واژگان
    Big data
    Economic risk
    Load uncertainly
    NSGA II
    RCM
    Optimization

    شماره نشریه
    4
    تاریخ نشر
    2019-10-01
    1398-07-09
    ناشر
    University of Sistan and Baluchestan
    سازمان پدید آورنده
    Department of Electrical and Power Engineering, Faculty of Engineering, Lorestan University, Khorramabad, Iran
    Department of Electrical and Power Engineering, Faculty of Engineering, Lorestan University, Khorramabad, Iran
    Department of Electrical and Power Engineering, Faculty of Engineering, Lorestan University, Khorramabad, Iran
    Electrical Eng. Dep.

    شاپا
    2645-3517
    2645-3568
    URI
    https://dx.doi.org/10.22111/ieco.2019.26404.1075
    https://ieco.usb.ac.ir/article_4702.html
    https://iranjournals.nlai.ir/handle/123456789/350483

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب