• ثبت نام
    • ورود به سامانه
    مشاهده مورد 
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • International Journal of Engineering
    • Volume 33, Issue 9
    • مشاهده مورد
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • International Journal of Engineering
    • Volume 33, Issue 9
    • مشاهده مورد
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Quay Cranes and Yard Trucks Scheduling Problem at Container Terminals

    (ندگان)پدیدآور
    Behjat, S.Nahavandi, N.
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    553.9کیلوبایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Original Article
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    A bi-objective mathematical model is developed to simultaneously consider the quay crane and yard truck scheduling problems at container terminals. Main real-world assumptions, such as quay cranes with non-crossing constraints, quay cranes' safety margins and precedence constraints are considered in this model. This integrated approach leads to better efficiency and productivity at container terminals. Based on numerical experiments, the proposed mathematical model is effective for solving small-sized instances. Two versions of the simulated annealing algorithm are developed to heuristically solve the large-sized instances. Considering the allocation of trucks as a grouping problem, a grouping version of the simulated annealing algorithm is proposed. Effectiveness of the presented algorithms is compared to the optimal results of the mathematical model on small-sized problems. Moreover, the performances of the proposed algorithms on large-sized instances are compared with each other and the numerical results revealed that the grouping version of simulated annealing algorithm outperformed simulated annealing algorithm. Based on numerical investigations, there is a trade-off between the tasks' completion time and the cost of utilizing more trucks. Moreover increasing the number of YTs leads to better outcomes than increasing the number of QCs. Besides two-cycle strategy and using dynamic assignment of yard truck to quay cranes leads to faster loading and unloading procedure.
    کلید واژگان
    quay crane scheduling
    yard truck scheduling
    non-crossing
    Simulated Annealing Algorithm
    Grouping
    safety margin
    Container Terminals

    شماره نشریه
    9
    تاریخ نشر
    2020-09-01
    1399-06-11
    ناشر
    Materials and Energy Research Center
    سازمان پدید آورنده
    Industrial & Systems Engineering Faculty, Tarbiat Modares University, Tehran, Iran
    Industrial & Systems Engineering Faculty, Tarbiat Modares University, Tehran, Iran

    شاپا
    1025-2495
    1735-9244
    URI
    https://dx.doi.org/10.5829/ije.2020.33.09c.08
    http://www.ije.ir/article_108466.html
    https://iranjournals.nlai.ir/handle/123456789/337861

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب