نمایش مختصر رکورد

dc.contributor.authorMoslemipour, G.en_US
dc.contributor.authorTavakkoli-Moghaddam, R.en_US
dc.date.accessioned1399-07-09T08:11:50Zfa_IR
dc.date.accessioned2020-09-30T08:11:50Z
dc.date.available1399-07-09T08:11:50Zfa_IR
dc.date.available2020-09-30T08:11:50Z
dc.date.issued2017-05-01en_US
dc.date.issued1396-02-11fa_IR
dc.identifier.citationMoslemipour, G., Tavakkoli-Moghaddam, R.. (2017). Performance Analysis of Dynamic and Static Facility Layouts in a Stochastic Environment. International Journal of Engineering, 30(5), 710-719.en_US
dc.identifier.issn1025-2495
dc.identifier.issn1735-9244
dc.identifier.urihttp://www.ije.ir/article_72939.html
dc.identifier.urihttps://iranjournals.nlai.ir/handle/123456789/336848
dc.description.abstractIn this paper, to cope with the stochastic dynamic (or multi-period) problem, two new quadratic assignment-based mathematical models corresponding to the dynamic and static approaches are developed. The product demands are presumed to be dependent uncertain variables with normal distribution having known expectation, variance, and covariance that change from one period to the next one, randomly. In the proposed models, time value of money and the decision maker's attitude about uncertainty are also considered. The models are verified and validated by performing statistical, robustness and stability analyses carried out by using design of experiment and benchmark methods. In addition, the effect of dependency of product demands and interest rate on the total cost function of the proposed models has also been investigated. The dynamic programming algorithm, which is coded in Matlab, is used to solve the models. The main conclusions are as follows: (i) the dynamic layout behaves like static layout in the case of low facility rearrangement cost; (ii) unlike the static layout, the robustness and stability of the dynamic layout depend on the facility rearrangement cost; (iii) the decision maker's attitude about uncertainty affects the robustness of each of the dynamic and static layouts; (iv) considering non-zero interest rate leads to increase in the total cost over the range of uncertainty; and (v) regarding both the dynamic and the static layouts, the effect of dependency of product demands on the total cost is a function of the decision maker's defined percentile level.en_US
dc.format.extent1127
dc.format.mimetypeapplication/pdf
dc.languageEnglish
dc.language.isoen_US
dc.publisherMaterials and Energy Research Centeren_US
dc.relation.ispartofInternational Journal of Engineeringen_US
dc.subjectDynamic facility layouten_US
dc.subjectQuadratic assignmenten_US
dc.subjectUncertaintyen_US
dc.subjectDynamic programmingen_US
dc.titlePerformance Analysis of Dynamic and Static Facility Layouts in a Stochastic Environmenten_US
dc.typeTexten_US
dc.contributor.departmentDepartment of Industrial Engineering, Payame Noor University, Iranen_US
dc.contributor.departmentSchool of Industrial Engineering, South Tehran Branch, Islamic Azad University, Tehran, Iranen_US
dc.citation.volume30
dc.citation.issue5
dc.citation.spage710
dc.citation.epage719


فایل‌های این مورد

Thumbnail

این مورد در مجموعه‌های زیر وجود دارد:

نمایش مختصر رکورد