| dc.contributor.author | GUPTA, SORABH | en_US |
| dc.contributor.author | Tewari, P.C | en_US |
| dc.date.accessioned | 1399-07-09T08:09:56Z | fa_IR |
| dc.date.accessioned | 2020-09-30T08:09:56Z | |
| dc.date.available | 1399-07-09T08:09:56Z | fa_IR |
| dc.date.available | 2020-09-30T08:09:56Z | |
| dc.date.issued | 2011-09-01 | en_US |
| dc.date.issued | 1390-06-10 | fa_IR |
| dc.identifier.citation | GUPTA, SORABH, Tewari, P.C. (2011). Performance Modeling of Power Generation System of a Thermal Plant. International Journal of Engineering, 24(3), 239-248. | en_US |
| dc.identifier.issn | 1025-2495 | |
| dc.identifier.issn | 1735-9244 | |
| dc.identifier.uri | http://www.ije.ir/article_71918.html | |
| dc.identifier.uri | https://iranjournals.nlai.ir/handle/123456789/336230 | |
| dc.description.abstract | The present paper discusses the development of a performance model of power generation system of a thermal plant for performance evaluation using Markov technique and probabilistic approach. The study covers two areas: development of a predictive model and evaluation of performance with the help of developed model. The present system of thermal plant under study consists of four subsystems with three possible states: full working, reduced capacity working and failed. Failure and repair rates for all the subsystems are assumed to be constant. A transition diagram represents the operational behavior of the system. A probabilistic model has been developed, considering some assumptions. Data in feasible range are selected from a survey of thermal plant and the effect of each subsystem on the system availability is tabulated in the form of availability matrix, which provides various performance/availability levels for different combinations of failure and repair rates of all subsystems. | en_US |
| dc.format.extent | 2380 | |
| dc.format.mimetype | application/pdf | |
| dc.language | English | |
| dc.language.iso | en_US | |
| dc.publisher | Materials and Energy Research Center | en_US |
| dc.relation.ispartof | International Journal of Engineering | en_US |
| dc.subject | Markov Technique | en_US |
| dc.subject | Probabilistic approach | en_US |
| dc.subject | Operational Behavior and Availability Matrix | en_US |
| dc.title | Performance Modeling of Power Generation System of a Thermal Plant | en_US |
| dc.type | Text | en_US |
| dc.contributor.department | ADMINISTRATION, RPIIT KARNAL | en_US |
| dc.contributor.department | , National Institute of Technology, Kurukshetra. | en_US |
| dc.citation.volume | 24 | |
| dc.citation.issue | 3 | |
| dc.citation.spage | 239 | |
| dc.citation.epage | 248 | |