SINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT
(ندگان)پدیدآور
Li, JinquanXu, DehuaLi, Hongxing
نوع مدرک
TextResearch Paper
زبان مدرک
Englishچکیده
In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of a cost function thatincludes the costs of earliness, tardiness, makespan and resource consumption jointly by scheduling the jobs under precedence constraints and determining the due date and the resource allocation amount satisfying resource constraints for each job. First, the problem is shown to be NP-hard. Furthermore, an optimal algorithm with polynomial time for the special case of this problem is put forward. Moreover, an efficient 2-approximation algorithm is presented based on solving the relaxation of the problem. Finally, the numerical experiment is given, whose results show that our method is promising.
کلید واژگان
Fuzzy schedulingFuzzy number
Possibilistic mean value and variance
Due date assignment scheduling
Precedence constraints
Controllable processing times
شماره نشریه
6تاریخ نشر
2018-12-011397-09-10
ناشر
University of Sistan and Baluchestanسازمان پدید آورنده
School of Applied Mathematics, Zhuhai Municipal Key Laboratory of Intelligent Control, Beijing Normal University Zhuhai, Zhuhai 519087, P.R. ChinaSchool of Science, East China University of Technology, Nanchang 330013, P.R. China
School of Electronic and Information Engineering, Dalian University of Technology, Dalian 116024, P.R. China
شاپا
1735-06542676-4334



