    Total productive maintenance policy to increase effectiveness and maintenance performance using overall equipment effectiveness

    (ندگان)پدیدآور
    Nurprihatin, FilschaAngely, MeililyTannady, Hendy
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    592.8کیلوبایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Research Paper
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    In the manufacturing process, the machine is very important because downtime can inhibit and even stop production. We focused on the highest downtime that occurred in a particular product line and critical machine. This research contributes to overcoming and making the machine's performance and ability better. We make use the Total Productive Maintenance (TPM), which started by calculating Overall Equipment Effectiveness (OEE) and Six Big Losses. This study also provides the maintenance attempt to increase the effectiveness and to eliminate losses incurred by calculating Mean Time Between Failure (MTBF) and Mean Time To Repair (MTTR). Finally, we proposed the TPM implementation to improve the effectiveness of the machine. The result showed that the OEE has not reached the ideal value due to the low availability. Breakdown losses contributed to the biggest factor in the loss. The way to overcome the cause of breakdown losses is to increase performance maintenance, by calculating and evaluating MTBF and MTTR. This research presented the cause of the low value of OEE, provided the performance maintenance policy according to MTBF and MTTR, and proposed the TPM implementation.
    کلید واژگان
    Total Productive Maintenance
    Overall Equipment Effectiveness
    Six Big Losses
    Mean Time Between Failure
    Mean Time To Repair

    شماره نشریه
    3
    تاریخ نشر
    2019-09-01
    1398-06-10
    ناشر
    Ayandegan Institute of Higher Education, Iran
    سازمان پدید آورنده
    Department of Industrial Engineering, Universitas Bunda Mulia, Jakarta-14430, Indonesia.
    Department of Industrial Engineering, Universitas Bunda Mulia, Jakarta-14430, Indonesia.
    Department of Management, Universitas Pembangunan Jaya, Banten, Indonesia.

    شاپا
    2538-5100
    2676-6167
    URI
    https://dx.doi.org/10.22105/jarie.2019.199037.1104
    http://www.journal-aprie.com/article_95315.html
    https://iranjournals.nlai.ir/handle/123456789/27012

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب