    Implementation of repairing production machine productivity of spare parts speaker based on OEE value achievement

    (ندگان)پدیدآور
    Perdana, SuryaSaroso, Dana
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    291.0کیلوبایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Research Paper
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    The industry under study is a company in the field of making Speaker, Megaphone and Amplifier. In this study, the Thoshiba IS 350 GS 350 Ton machine has observed. Constraints such as when producing machine Speaker Parts produce high reject products up to 7% of the total monthly production. When operating the machine often experiences downtime due to damage to the engine. Damage causes high employee overtime due to having to pursue production targets and the costs to be incurred by the company can reach Rp. 3 billion per month. Evaluation is done by calculating Overall Equipment Effectiveness (OEE) and comparing with OEE before repairs. Furthermore, discussed the factors that influence the effectiveness of the Injection molding machine contained in the six big losses and other problems where the method of analysis with fishbone diagrams. After that, the discussion was conducted using the analysis of Failure Mode and Effect Analysis (FMEA) to identify and analyze potential failures and their consequences. From the results of the observation, the main cause of damage to the Thoshiba IS 350 GS 350 Ton machine is the low Performance Rate with an average value of 63.5% in April 2018, this is caused by the value of Reduced Speed Losses that have the biggest contribution in six big losses with a loss of 86.9 hours which results in the Thoshiba IS 350 GS 350 Ton Machine not working optimally.
    کلید واژگان
    Overall Equipment Effectiveness
    Failure Mode and Effect Analysis
    performance
    Quality Control

    شماره نشریه
    1
    تاریخ نشر
    2019-04-01
    1398-01-12
    ناشر
    Ayandegan Institute of Higher Education, Iran
    سازمان پدید آورنده
    Department of Industrial Engineering, Postgraduate Faculty, Mercu Buana University, Jakarta 11650, Indonesia.
    Department of Industrial Engineering, Postgraduate Faculty, Mercu Buana University, Jakarta 11650, Indonesia.

    شاپا
    2538-5100
    2676-6167
    URI
    https://dx.doi.org/10.22105/jarie.2019.169386.1075
    http://www.journal-aprie.com/article_85622.html
    https://iranjournals.nlai.ir/handle/123456789/26950

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب