• ثبت نام
    • ورود به سامانه
    مشاهده مورد 
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Journal of Applied Research on Industrial Engineering
    • Volume 6, Issue 1
    • مشاهده مورد
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Journal of Applied Research on Industrial Engineering
    • Volume 6, Issue 1
    • مشاهده مورد
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Implementation of the quality control circle for improvement of painting production in PT QWE

    (ندگان)پدیدآور
    Hernadewita, HernadewitaHerdiawan, DikyAfriyuddin, AfriyuddinHermiyetti, Hermiyetti
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    368.0کیلوبایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Research Paper
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    As one manufacturing industry which has engaged in the textile industry and produced zippers, the painting process at zipped production has a number of problems, as on zipper sticks to each other, uneven paint, etc. In this discussion, the improvements that will be made are related to the painting process.  Quality Control Circle (QCC) method is applied to reflect the support of the continuous improvement program in the company. The painting process is the finishing process of a zipper that serves as a coating to be resistant to corrosion and enhance the zipper appearance. The results of the study, it is found the main problem in the zipper painting process, which are Abbeku or sticking. This is due to the factors, such as machinery, methods, and materials. Of the three factors, there is one of the biggest problem factors, namely the position of non-standard spray gun. The focus of the improvement that will be made is the modification of the spraygun holder so that the fix position does not change. The results after an improvement in the modification of the spray gun holder are Abbeku (sticking) loss on the painting production which is originally 23 lots. As a conclusion, it eliminates the biggest loss factor in the painting process, replaced the position of the spraygun that is not fixed.
    کلید واژگان
    Quality Control
    Quality Control Circle
    Zippers
    Painting Process
    Quality Control

    شماره نشریه
    1
    تاریخ نشر
    2019-04-01
    1398-01-12
    ناشر
    Ayandegan Institute of Higher Education, Iran
    سازمان پدید آورنده
    Department of Industrial Engineering, University of Mercu Buana, Jakarta, Indonesia.
    Department of Industrial Engineering, University of Mercu Buana, Jakarta, Indonesia.
    Department of Industrial Engineering, University of Mercu Buana, Jakarta, Indonesia.
    Faculty of Economic Social Science, Bakrie University, Indonesia.

    شاپا
    2538-5100
    2676-6167
    URI
    https://dx.doi.org/10.22105/jarie.2019.169238.1074
    http://www.journal-aprie.com/article_85621.html
    https://iranjournals.nlai.ir/handle/123456789/26949

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب