• ثبت نام
    • ورود به سامانه
    مشاهده مورد 
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Journal of Applied Research on Industrial Engineering
    • Volume 2, Issue 1
    • مشاهده مورد
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Journal of Applied Research on Industrial Engineering
    • Volume 2, Issue 1
    • مشاهده مورد
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Prioritizing the Aspects of Project Management Agility Using Contractors’ and Employers' Perceptions and Expectations by DEA Method in a Case Study in Foolad Technique Co.

    (ندگان)پدیدآور
    Shirouyehzad, HadiShahin, ArashDayani, Mina
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    778.4کیلوبایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    Agile project management concept was introduced in the 21st century for the first time to provide continuous and timely software to provide value to the shareholders. This method is also useful for a variety of projects to respond to environmental changes. As a dynamic business area, always there is a balance between the current and desired status of project-based organizations for which the study of the agile gap is important. In addition, there is no exact definition for desired status. Therefore, studying perception and expectation of contractors and employers is playing a main role for agile project management analysis. In this paper, data envelopment analysis has been applied to identify the most critical agile project management dimensions, based on the difference between contractors' and employers' perceptions and expectations. The case study includes six projects in Foolad technique Co. , the results showed that the following criteria are in critical condition in Foolad Technique Company: "team capabilities", " Customer Involvement", " Delivery Strategy" and "organizational environment"
    کلید واژگان
    Agile Project Management
    Data Envelopment Analysis
    Expection
    Perception
    Foolad Technique
    Employer
    Contractor
    Prioritizing

    شماره نشریه
    1
    تاریخ نشر
    2015-03-01
    1393-12-10
    ناشر
    Ayandegan Institute of Higher Education, Iran
    سازمان پدید آورنده
    Department of Industrial Engineering, Najafabad Branch, Islamic Azad University, Iran
    Department of Management,University of Isfahan, Isfahan, Iran
    Department of Industrial Engineering, Najafabad Branch, Islamic Azad University, Najafabad, Iran

    شاپا
    2538-5100
    2676-6167
    URI
    http://www.journal-aprie.com/article_42987.html
    https://iranjournals.nlai.ir/handle/123456789/26924

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب