• ثبت نام
    • ورود به سامانه
    مشاهده مورد 
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Journal of Industrial Engineering and Management Studies
    • Volume 7, Issue 1
    • مشاهده مورد
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Journal of Industrial Engineering and Management Studies
    • Volume 7, Issue 1
    • مشاهده مورد
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Simulation based optimization of multi-product supply chain under a JIT system

    (ندگان)پدیدآور
    Sajedinejad, ArmanHassannayebi, ErfanAsadi Lari, Mohammad Saviz
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    978.6کیلوبایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Original Article
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    It is scientifically challenging to determine the inventory level all through the supply chain in such a way that the desired objectives such as effectiveness and responsiveness of the supply chain system can be obtained. Simulation is a means for solving various problems which cannot be solved by regular exact models such as mathematical ones due to their complexity. The present paper is aimed at simulating lean multi-product supply chain system as well as optimization of the objectives of supply chain. Variables of the simulation model include two types of Kanbans namely withdrawal, and production to determine the inventory level, and batch size of delivery parts for each stage of supply chain. So, in this paper simulation model was developed for supply chains, taking into consideration the different production scenarios and were modeled and compared. A production scenario is adopted for each level of the chain in order to achieve the objectives. The use of meta-heuristic techniques leads us to optimization of these variables which helps decrease delay of both product delivery and inventory level of supply chain. In this case, Genetic Algorithm has applied to find the best variable values of each scenario (included in the right number of each Kanbans), aimed at decreasing the costs and delivery delays. An example based on a case study is given to illustrate the efficiency of the proposed approach. Considering each level of supply chain, the ratio between and among cost, inventory, and delivery delay variables were obtained.
    کلید واژگان
    Supply chain management
    Genetic Algorithm
    optimization
    Just In Time
    discrete event simulation

    شماره نشریه
    1
    تاریخ نشر
    2020-06-01
    1399-03-12
    ناشر
    Iran Center for Management Studies
    سازمان پدید آورنده
    Iranian Research Institute for Information Science and Technology (IRANDOC).
    Industrial Engineering Department, Sharif University of Technology, Tehran, Iran.
    Engineering Department, Payame Noor University (PNU), Tehran, Iran.

    شاپا
    2476-308X
    2476-3098
    URI
    https://dx.doi.org/10.22116/jiems.2020.110009
    http://jiems.icms.ac.ir/article_110009.html
    https://iranjournals.nlai.ir/handle/123456789/257857

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب