نمایش مختصر رکورد

dc.contributor.authorSaberinasab, Javaden_US
dc.contributor.authorSahraeian, Rasheden_US
dc.contributor.authorRohaninejad, Mohammaden_US
dc.date.accessioned1399-07-09T04:15:14Zfa_IR
dc.date.accessioned2020-09-30T04:15:15Z
dc.date.available1399-07-09T04:15:14Zfa_IR
dc.date.available2020-09-30T04:15:15Z
dc.date.issued2018-10-01en_US
dc.date.issued1397-07-09fa_IR
dc.date.submitted2016-06-06en_US
dc.date.submitted1395-03-17fa_IR
dc.identifier.citationSaberinasab, Javad, Sahraeian, Rashed, Rohaninejad, Mohammad. (2018). Achieving an Optimal Lower Bound for Two Stage Supply Chain Scheduling with Regard to the Different Setup Time. Advances in Industrial Engineering, 52(3), 421-431. doi: 10.22059/jieng.2019.208981.1149en_US
dc.identifier.issn2423-6896
dc.identifier.issn2423-6888
dc.identifier.urihttps://dx.doi.org/10.22059/jieng.2019.208981.1149
dc.identifier.urihttps://jieng.ut.ac.ir/article_71912.html
dc.identifier.urihttps://iranjournals.nlai.ir/handle/123456789/257728
dc.description.abstractIn this paper, a two-stage supply-chain scheduling problem including manufacturers and distributors will be investigated and modeled. The objective function is to minimize the makespan, which is equivalent to the completion time of the last job to leave the system. A minimum makespan usually implies a good utilization of the machine(s). In this research, serial batching machines do jobs processing and then the jobs will deliver to customers (in the next stage) for further processing. The capacity of each batch is limited. Delivery unit cost of each batch is fixed and independent of the number of jobs in the batch. Processing and setup time of jobs are varying according to jobs types. The setup time is determined according to jobs type within each batch. The problem has been formulated as a mixed integer-programming model. Finally, a lower bound will be provided. Computational experiments demonstrate the performance of new lower band.en_US
dc.format.extent803
dc.format.mimetypeapplication/pdf
dc.languageEnglish
dc.language.isoen_US
dc.publisherUniversity of Tehranen_US
dc.relation.ispartofAdvances in Industrial Engineeringen_US
dc.relation.isversionofhttps://dx.doi.org/10.22059/jieng.2019.208981.1149
dc.subjectSupply Chain Schedulingen_US
dc.subjectSetup Timeen_US
dc.subjectBatch Deliveryen_US
dc.subjectLower Bounden_US
dc.titleAchieving an Optimal Lower Bound for Two Stage Supply Chain Scheduling with Regard to the Different Setup Timeen_US
dc.typeTexten_US
dc.typeResearch Paperen_US
dc.citation.volume52
dc.citation.issue3
dc.citation.spage421
dc.citation.epage431


فایل‌های این مورد

Thumbnail

این مورد در مجموعه‌های زیر وجود دارد:

نمایش مختصر رکورد