    Robust Optimization of Resource-constrained Multi-Project Scheduling Problem with Uncertain Activities Duration

    (ندگان)پدیدآور
    Nabipour Afrazi, ElhamAghaei, Abdollah
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    1.092 مگابایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Research Paper
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    Multi-project scheduling problem is one of the most important problems in the project scheduling applications, which has attracted considerable attention in the past decades. Due to the importance of resources in the multi-project scheduling problem, the resource sharing policy is used in this research. In addition, in each project, the activities durations are subject to the considerable uncertainty. Due to the rapid changing of the environment and also the uniqueness of the projects, one cannot estimate the probability distribution for the activity uncertain durations with certainty. In addition, the problem in multi-project scale needs a more conservative approach when facing with uncertainty. Therefore, the robust optimization approach is employed in this paper. So that the maximum total weighted tardiness of the projects should become minimum. The robust resource-constrained multi-project scheduling problem (RRCMPSP) is investigated in this paper as a two-stage model. A scenario relaxation algorithm is applied resulting optimal solutions for the RRCMPSP, which is tested on the examples produced by the RanGen. So, in this paper, an overall optimal structure containing all of the projects for the multi-project problem is obtained in a way that the maximum differences between the finish time of projects and their due date would become minimum.
    کلید واژگان
    Activity Duration Scenario
    Minimization of Maximum Regret
    Multi-project Scheduling Problem
    Resource Constraint
    Robust optimization
    Operation Research and Project Management

    شماره نشریه
    2
    تاریخ نشر
    2018-07-01
    1397-04-10
    ناشر
    University of Tehran
    سازمان پدید آورنده
    Department of Industrial Engineering, Khajeh Nasir Toosi University of Technology, Tehran, Iran
    Department of Industrial Engineering, Khajeh Nasir Toosi University of Technology, Tehran, Iran

    شاپا
    2423-6896
    2423-6888
    URI
    https://dx.doi.org/10.22059/jieng.2018.237585.1402
    https://jieng.ut.ac.ir/article_71072.html
    https://iranjournals.nlai.ir/handle/123456789/257654

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب