• ثبت نام
    • ورود به سامانه
    مشاهده مورد 
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Journal of Industrial and Systems Engineering
    • Volume 2, Issue 3
    • مشاهده مورد
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Journal of Industrial and Systems Engineering
    • Volume 2, Issue 3
    • مشاهده مورد
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Scheduling Accumulated Rework in a Normal Cycle: Optimal Batch Production with Minimum Rework Cycles

    (ندگان)پدیدآور
    Haji, BabakHaji, AlirezaRahmati Tavakol3, Ali
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    96.22کیلوبایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Research Paper
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    In this paper we consider a single machine system that produces items part of which are defective. The defective items produced in a time period, consisting of several equal cycles, are accumulated and are all reworked in the last cycle of this period called the rework cycle. At the end of the rework cycle the whole process will start all over again. The first significant objective of this study is that, for the ease of production and resource planning, the rework cycle has to have the same length as the other cycles. The other objective is that the number of rework cycles be as small as possible, because of changeover costs needed for going from normal production to rework as well as special attention required for rework to satisfy the zero defect criterion. For this system, assuming no shortages are permitted we drive the total system cost per unit time and obtain the economic batch quantity which minimizes this total cost.
    کلید واژگان
    Imperfect Production
    Economic batch quantity
    Rework
    Inventory Control
    Production Planning & Control
    Scheduling

    شماره نشریه
    3
    تاریخ نشر
    2008-12-01
    1387-09-11
    ناشر
    Iranian Institute of Industrial Engineering
    سازمان پدید آورنده
    Department of Industrial Engineering, Sharif University of Technology, Tehran, Iran, P.O.box11365-9414
    Department of Industrial Engineering, Sharif University of Technology, Tehran, Iran, P.O.box11365-9414
    Department of Industrial Engineering, Sharif University of Technology, Tehran, Iran, P.O.box11365-9414

    شاپا
    1735-8272
    URI
    http://www.jise.ir/article_3980.html
    https://iranjournals.nlai.ir/handle/123456789/252240

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب