    A multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations

    (ندگان)پدیدآور
    eydi, alirezabakhshi, mohsen
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    1.384 مگابایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Research Paper
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, this study is aimed at proposing a multi-objective model for resource-constrained project scheduling problem, with the model objectives being to minimize makespan, and maximize net present value of the project cash flows; the proposed model has activity times expressed in fuzzy numbers where the corresponding uncertainties are taken into account. The project environment is considered to be a multi-resource environment where more than one resource is needed for the execution of any activity. Also, the proposed model comes with time lags in precedence relations between activities. The proposed model is validated by using epsilon-constraint method. The α-cut approach as well as the expression of acceptable risk level by the project manager is used to defuzzificate fuzzy activity durations. Since the problem is NP-hard, a NSGA-II meta-heuristic algorithm is proposed to solve the problem. The algorithm performance has been evaluated in terms of different criteria.
    کلید واژگان
    Resource-constrained project scheduling
    fuzzy activity times
    time lags
    Cash Flows
    α-cut
    NSGA-II evolutionary algorithm
    Metaheaurestic Techniques
    multi objective optimization
    Project Management

    تاریخ نشر
    2019-01-01
    1397-10-11
    ناشر
    Iranian Institute of Industrial Engineering
    سازمان پدید آورنده
    Department of Industrial Engineering, University of Kurdistan, Sanandaj, Iran
    Department of Industrial Engineering, University of Kurdistan, Sanandaj, Iran

    شاپا
    1735-8272
    URI
    http://www.jise.ir/article_78696.html
    https://iranjournals.nlai.ir/handle/123456789/252112

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب