    Project resource investment problem under progress payment model

    (ندگان)پدیدآور
    Najafi, Amir AbbasMerrikhi, ElhamShahsavar, Aria
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    933.7کیلوبایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Research Paper
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    As a general branch of project scheduling problems, resource investment problem (RIP) considers resource availabilities as decision variables to determine a level of employed resources minimizing the costs of the project. In addition to costs (cash outflows), researchers in the later extensions of the RIP took payments (cash inflows) received from clients into account and used the net present value (NPV) of project cash flows as a financial criterion evaluating the profitability of the project. A striking point in a financial view of the project scheduling is how cash inflows are paid by the client. There are different payment models in the literature of which progress payment is highly common in practice. In this paper, resource investment problem with maximization of the NPV under progress payment model is investigated. A new mathematical model is developed for the problem and then two metaheuristic algorithms based on the genetic algorithm (GA) and simulated annealing algorithm (SA) are suggested. The experimental results of algorithms are compared with some near-optimal solutions derived from LINGO software. The comparisons show that the results of GA are more reliable than SA.
    کلید واژگان
    Project scheduling
    resource investment
    Net Present Value
    progress payment
    Project Management

    شماره نشریه
    3
    تاریخ نشر
    2018-07-01
    1397-04-10
    ناشر
    Iranian Institute of Industrial Engineering
    سازمان پدید آورنده
    k.n.toosi university
    Research School of Management, Australian National University, Canberra, Australia
    Faculty of Industrial and Mechanical Engineering, Islamic Azad University, Qazvin Branch, Qazvin, Iran

    شاپا
    1735-8272
    URI
    http://www.jise.ir/article_60777.html
    https://iranjournals.nlai.ir/handle/123456789/252068

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب