dc.contributor.authorGholami, Saeedehen_US
dc.contributor.authorDeymeh, Faezehen_US
dc.date.accessioned1399-07-09T03:58:37Zfa_IR
dc.date.accessioned2020-09-30T03:58:37Z
dc.date.available1399-07-09T03:58:37Zfa_IR
dc.date.available2020-09-30T03:58:37Z
dc.date.issued2014-12-01en_US
dc.date.issued1393-09-10fa_IR
dc.date.submitted2014-11-29en_US
dc.date.submitted1393-09-08fa_IR
dc.identifier.citationGholami, Saeedeh, Deymeh, Faezeh. (2014). Robust scheduling for three-machine robotic cell using interval data. Journal of Industrial and Systems Engineering, 7(1), 129-140.en_US
dc.identifier.issn1735-8272
dc.identifier.urihttp://www.jise.ir/article_96814.html
dc.identifier.urihttps://iranjournals.nlai.ir/handle/123456789/251915
dc.description.abstractIn reality, due to the lack of adequate environmental information, uncertainty is a common practice. In order to provide good and acceptable solutions, development of systematic methods for solving problems of uncertainty is important. One of these methods is based on robust optimization. This type of planning is to find a solution that is not sensitive to parameter fluctuations. In this article, a new way is represented to solve a three-machine robotic cell problem. An intervallic processing time is concerned as the problem being discussed. Different scenarios are defined by using robust optimization; afterwards, applying min-max regret method, robust counterpart of original problem is specified. Since the problem is NP-hard, a metaheuristic is applied to solve it. Genetic Algorithm (GA) as a population-based metaheuristic is employed. Cycle time and program operating time are calculated for different number of parts. It is demonstrated that by increasing the part numbers, gap between the robust and original cycle time increases. It is observed that both the cycle time and algorithm operating time increase.en_US
dc.format.extent855
dc.format.mimetypeapplication/pdf
dc.languageEnglish
dc.language.isoen_US
dc.publisherIranian Institute of Industrial Engineeringen_US
dc.relation.ispartofJournal of Industrial and Systems Engineeringen_US
dc.subjectrobust optimizationen_US
dc.subjectmin-max regreten_US
dc.subjectCycle Timeen_US
dc.subjectGenetic Algorithmen_US
dc.titleRobust scheduling for three-machine robotic cell using interval dataen_US
dc.typeTexten_US
dc.typeResearch Paperen_US
dc.contributor.departmentDepartment of Industrial Engineering, K. N. Toosi University of Technology, Tehran, Iranen_US
dc.contributor.departmentDepartment of Industrial Engineering, K. N. Toosi University of Technology, Tehran, Iranen_US
dc.citation.volume7
dc.citation.issue1
dc.citation.spage129
dc.citation.epage140