• ثبت نام
    • ورود به سامانه
    مشاهده مورد 
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Journal of Mining and Environment
    • Volume 10, Issue 4
    • مشاهده مورد
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Journal of Mining and Environment
    • Volume 10, Issue 4
    • مشاهده مورد
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Use of a mixed integer programming model to achieve an optimum size of blast block in open-pit mining with regard to size of mineable block using fuzzy logic approach

    (ندگان)پدیدآور
    Mozafari, A.Bangian Tabrizi, A. H.Taji, M.Parhizkar, A.
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    1.074 مگابایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Original Research Paper
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    In this paper, we present an integrated model to find the optimum size of blast block that uses (i) a multi-criteria decision-making method to specify the applicable size of the mineable block; (ii) a linear programming method for the selection of the blasted areas to be excavated and in deciding the quantity of ores and wastes to be mined from each one of the selected blocks. These two methods use improved estimates of the orebody characteristics utilizing the blast hole data in addition to the usual borehole statistics to improve the prediction accuracy of the block level ore body characteristics. This work aims to make a mathematical model to figure out the ideal width and length of the blast block in order to curtail drilling and blasting expenses in open-pit mines. As a consequence, the effective blast block size is heeded so as to decrease the expenses of drilling and blasting. Furthermore, a complete set of actual principles is presented to specify the applicable size of the mineable block by means of the multi-criteria decision-making method of fuzzy logic. The aforementioned model is practiced to forecast the block size necessary for the purpose of production planning. Next, a mixed integer programming model is developed to blast planning in order to select the optimal size of the blast block by considering the mineable block. The proposed model is applied in the Chadormalu iron ore mine and the rationality of the model is demonstrated by the outcomes of dissimilar circumstances.
    کلید واژگان
    Blast block size
    Mineable Block
    Optimization
    Open-Pit Mine
    mixed integer programming
    fuzzy logic
    Ventilation & HSE

    شماره نشریه
    4
    تاریخ نشر
    2019-10-01
    1398-07-09
    ناشر
    Shahrood University of Technology
    سازمان پدید آورنده
    Department of Petroleum and Mining Engineering, Islamic Azad University, South Tehran Branch, Tehran, Iran
    Department of Petroleum and Mining Engineering, Islamic Azad University, South Tehran Branch, Tehran, Iran
    Department of Mining Engineering, Islamic Azad University, Shahrood Branch, Shahrood, Iran
    Department of Mining Engineering, Islamic Azad University, Lahijan Branch, Lahijan, Iran

    شاپا
    2251-8592
    2251-8606
    URI
    https://dx.doi.org/10.22044/jme.2019.8786.1763
    http://jme.shahroodut.ac.ir/article_1570.html
    https://iranjournals.nlai.ir/handle/123456789/243013

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب