• ثبت نام
    • ورود به سامانه
    مشاهده مورد 
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Journal of Mining and Environment
    • Volume 9, Issue 1
    • مشاهده مورد
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Journal of Mining and Environment
    • Volume 9, Issue 1
    • مشاهده مورد
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    UPL determination of multi-element deposits with grade uncertainty using a new block economic value calculation approach

    (ندگان)پدیدآور
    Jamshidi, M.Osanloo, M.
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    917.1کیلوبایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Case Study
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    The block economic value (BEV) of a single-metal deposit is calculated based on the metal content and the related costs. The common methods available for calculating BEV are just based upon the profitable elements, and the effects of undesirable elements on BEV are not considered. However, in multi-element deposits, the effects of other elements existing in the blocks on BEV should be considered with the purpose of optimizing the blending. These elements and blending methods have considerable effects on the quality of the final product. In this paper, a new approach is introduced to determine BEV in multi-element deposit with two types of profitable and penalty elements by considering the effect of blending on BEV. Consequently, the ultimate pit limits (UPLs) will be determined based on these conditions. The developed model is tested in the Gol-e-Gohar No.2 iron-ore mine, and the mine UPLs is determined. The results obtained showed that the mineable reserve of the pit increased by 3% when the effects of both types of elements are considered. In order to investigate the effect of grade uncertainty on BEV, twenty realizations of the ore block are generated using the sequential Gaussian simulation approach. The UPLs of all the realizations are determined using the developed BEV-calculation method, and the pit limits with different probabilities of occurrence are determined. The total mineable reserve varied between 20,380 and 46,410 million tons. The exploitation of mine should start with the smallest pit (100% probability). The largest pit should be considered as a guide for surface-facility locating.
    کلید واژگان
    BEV
    multi-element deposits
    Pit limits
    grade uncertainty
    Open-Pit Mining
    Ventilation & HSE

    شماره نشریه
    1
    تاریخ نشر
    2018-01-01
    1396-10-11
    ناشر
    Shahrood University of Technology
    سازمان پدید آورنده
    Mining and Metallurgical Engineering Department, Amirkabir University of Technology (Tehran Polytechnic), Tehran, Iran
    Mining and Metallurgical Engineering Department, Amirkabir University of Technology (Tehran Polytechnic), Tehran, Iran

    شاپا
    2251-8592
    2251-8606
    URI
    https://dx.doi.org/10.22044/jme.2017.5763.1387
    http://jme.shahroodut.ac.ir/article_1041.html
    https://iranjournals.nlai.ir/handle/123456789/242730

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب